Shared Flashcard Set

Details

Week 2/3 lists
RPV, CRDM RBCCW EECW
17
Other
Professional
06/11/2015

Additional Other Flashcards

 


 

Cards

Term
100% Core Flow
Definition
100.0 x 106 lbm/hr.
Term
L8 funtion
Definition
Trips HPCI & RCIC (WR), RFPT, Main Turb, F001 in SBFW (NR)
Term
L7 funtion
Definition
HI Level Alarm
Term
L4 funtion
Definition
Lo Level Alarm, Limiter 2
Term
L3 NR funtion
Definition
RPS Scram, Groups 4,13,15, ADS confirmation
Term
L2 WR funtion
Definition
LPCI Loop Select, HPCI/RCIC start, Recirc Trip (from ARI), CCHVAC to recirc, RBHVAC trip, SBGT starts, Groups 2,10,11,12,14,16,17,18, CAC Start
Term
L1 WR funtion
Definition
CS Starts, RHR starts, RHRSW trips, HPCI/RCIC Baro & vac pumps trip, ADS Timer, RB floor & eq drain sumps trips, DW cooling stop or low speed, Groups 1,3,5.
Term
L0 funtion
Definition
RHR torus cooling/spray, DW Spray isolates.
Term
Limiter No. 1(Initiation signal)
Definition
F031* not FO or <20% FW flow
Term
Limiter No. 2(Initiation signal)
Definition
Lose of one RFPT and L4
Term
Limiter No. 3(Initiation signal)
Definition
F026A/B closed (Htr drains) + 3sec
Term
Limiter No. 4(Initiation signal)
Definition
Other recirc pump TRIPped. Drive motor or field breaker open.
Term
Limiter No. 1(prevents)
Definition
Prevents RR pump cavitation & Axial Thrust
Term
Limiter No. 2(prevents)
Definition
Prevents L3 scram
Term
Limiter No. 3(prevents)
Definition
Prevents L3 scram
Term
Limiter No. 4(prevents)
Definition
Prevents JP/piping vibration
Term
Recirc MG trips
Definition
ATWS/ARI Suction or Discharge Valve MG set high air temp MG set low oil press MG set high LO temp 65G under voltage MG set generator lockout
Supporting users have an ad free experience!