Term
According to TB #97 what are the 3 ways a person can escalate or de-escalate a potential confrontation? |
|
Definition
Actions
Demeanor
Attitude |
|
|
Term
According the TB#97 what is the "key" to dealing with people? |
|
Definition
|
|
Term
TB#97 says that _______ is the "most meaningful way" in which we communicate with the public? |
|
Definition
Non-Verbal or body language |
|
|
Term
TB #97 says the message that we send to others is often __________% content, __________ Voice and ___________ NON VERBAL |
|
Definition
|
|
Term
TB #97
Nonverbal communication is often unplannes and can have more impact that verbal communication. It is not only reliable but can show _____? |
|
Definition
|
|
Term
TB #97
What are the five categories of non-verbal communication? |
|
Definition
Voice signals
Body signals
Object signals (outward appearance)
Space Signals (personal space)
Time Signals (being on time)
|
|
|
Term
TB #97
It has been shown that an intimate distance reserved for only loved ones is between ____ while a personal distance for good friends is ______. |
|
Definition
|
|
Term
TB 97
The Social distance for acquaintances is between _________ |
|
Definition
|
|
Term
TB 97
The Public distance for strangers is ______? |
|
Definition
|
|
Term
According to the TB 94 Asbestos handout any open flame for lighting and decour shall not be installes in any area within ____ Feet of any combustible material. |
|
Definition
|
|
Term
According to the handout on TB#94 what is the definition of Asbestos Containing Material?? |
|
Definition
Any material containing .1 percent or more dry weight asbestos. |
|
|
Term
According to the handout on TB#94 the
PRIMARY PURPOSE of a _______ is to maintain a negative atmosphere in the containment area. |
|
Definition
|
|
Term
According to the handout on TB#94 the reapplication of an approved fire protective coating is called a ? |
|
Definition
|
|
Term
According to the handout on TB#94 what is the minimum amount of asbestos removal requiring a permit?
Who is exempt from this project permit? |
|
Definition
100 square feet of ACM
Any residential structure of 4 Units or less |
|
|
Term
According to the handout on TB#94 how long is a asbestos abatement permit good for? |
|
Definition
|
|
Term
According to the handout on TB#94 who collects the fees for a asbestos permit and where? |
|
Definition
collected by FD sucka!!
Engineering unit |
|
|
Term
According to the handout on TB#94 how many PLOT PLANS showing the size undergoing abatement are required and what size shall they be? |
|
Definition
|
|
Term
According to the handout on TB#94 how many days prior to the abatement do you need to obtain the permit? |
|
Definition
|
|
Term
According to the handout on TB#94 what is the asbestos permit fee? |
|
Definition
flat rate fee of $300 plus 9 cents per square foot over 1,000 square feet. |
|
|
Term
According to the handout on TB#94 how many completed copies of the SCAQMD forms shall be submited to the fire department?
A seperate letter shall be mailed by the contractor to the FD within _____ hours of the completion of the project. |
|
Definition
|
|
Term
According to the handout on TB#94 where shall the contractor keep the abatement plans upon completion? How often shall they be updated? |
|
Definition
3 ring binder in the FIRE CONTROL ROOM, SECURITY DESK or an approved location.
Updated DAILY |
|
|
Term
According to the handout on TB#94 any plastics used in the abatement process need a MSDS. Tape and Plexiglass viewing ports are an exception unless ??? |
|
Definition
The ports are larger then 4 sq ft
and
total aggregate area of < 40 sq ft. |
|
|
Term
According to the handout on TB#94 how many clearly marked exits shall be maintained from each floor during the process?
How do you identify a COVERED EXIT? |
|
Definition
2
Outlined in RED Duct tape and a cutting device kept adjacent to the door also surrouned in a square of RED duct tape. |
|
|
Term
According to the handout on TB#94 what is required in a multi-story building when >25% of the floor area is undergoing abatement? |
|
Definition
1) Permitted on a floor by floor basis provided NO 2 consecutive floors are undergoing abatement. A maximum of EVERY OTHER FLOOR, up to a total of 3 floors out of 5 is permitted.
2) a minimum of 5 clean BUFFER floors must seperate each group fromt he next floor group. |
|
|
Term
According to the handout on TB#94 what is the maximum total floor space allowed to be under active abatement in a single story house? |
|
Definition
|
|
Term
According to the handout on TB#94 in multistory/single story buildings what size ASBESTOS ABATEMENT sign must be placed in the Fire Control Room next to the Annunciator Pannel? |
|
Definition
|
|
Term
According to the handout on TB#94 in multistory buildings what size sign for the
FLOORS INVOLVED must be placed in the Fire Control Room next to the Annunicatory panel. |
|
Definition
12"x12" with 3"high and 1/2" wide lettering on a contrasting background |
|
|
Term
According to the handout on TB#94 where to the Asbestos Abatement and Floors Involved signs get posted other then the Fire Control Room? |
|
Definition
1) Each landing in each stairwell which leads to any floor undergoing abatement.
2) Begining 2 floors below the affected floor
3) On the floor above the affected floor. |
|
|
Term
According to the handout on TB#94 what is the mimimum size fire extinguisher allowed?
Where shall they be placed?
What are the distances?
What is the Exception to this?
|
|
Definition
1) 4A/60BC
2) Each Electrical Panel & Each corner of the work area
(5 ft of external entry from work area, 5Ft external area from clean room.Maximum travel distance of 75Ft)
3) area is less than 1,000 square feet |
|
|
Term
According to the handout on TB#94 a minimum of ____ TELEPHONES shall be provided for contacting emergency personnel in containment areas >1000sq ft. SHALL be located in the CLEAN ROOM |
|
Definition
|
|
Term
According to the handout on TB#94 how many LINEAL feet from the clean room shall the telephone be. |
|
Definition
|
|
Term
According to the handout on TB#94 all sprinkler heads shall remain active, however they may be covered with a ______ or LESSS plastic bag. |
|
Definition
|
|
Term
According to the handout on TB#94 all existing fire alarm boxes and communications remain in place. If covered in plastic it must be surrounded in a RED duct type square with the cutting device also in a RED square. They shall be clearly marked with a sign _________ |
|
Definition
3" high and 1/2" wide on a contrasting background |
|
|
Term
According to the handout on TB#94 if a fire and life safety system has been dissconnected it requires acceptance from the Fire Department and _______ upon RENCONNECTION. |
|
Definition
|
|
Term
According to the handout on TB#94 what is required by BUILDING AND SAFETY if the containment area impedes normal operation of elevators. |
|
Definition
an additional TEMPORARY elevator recall smoke detector. Tested by the LAFD |
|
|
Term
According to the handout on TB#94 how many protective suits are required?
What size shall they be?
How is the box they're kept in identified? |
|
Definition
5
XLG
RED BOX identified with WHITE 3" letters stating FIRE DEPARTMENT USE ONLY |
|
|
Term
According to the handout on TB#94 an area thatis contaminated shall be visible from a VIEWING PORT from an UNcontaminated area. What size are the ports? |
|
Definition
|
|
Term
According to the handout on TB#94 a sign reading NEGATIVE AIR MASTER SHUTT-OFF is over the switch or switches in a noncontaminated room with a sign of what size? |
|
Definition
|
|
Term
According to the handout on TB#94 the permit for the negative air equipment is provided by? |
|
Definition
Department of Building and Safety |
|
|
Term
According to the handout on TB#94 all bagged asbestos shall be removed and disposed of ______________? or 24-Hour period if work is continuous. |
|
Definition
at the end of each working day |
|
|
Term
According to the handout on TB#94
How many days after receipt of the final clearance shall the RESPRAY be completed? |
|
Definition
|
|
Term
According to the handout on TB#94
All asbestos abatement projects REGARDLESS OF SIZE require a |
|
Definition
on site supervisor designated as a
SAFETY COORDINATOR |
|
|
Term
According to the handout on TB#94
If the Asbestos project is 1,000 sq ft or more a member is required for __________ if the
fire protective coating or structural members are removed.
|
|
Definition
|
|
Term
According to the handout on TB#94
How often must the Fire watch inspect every area of the work site? |
|
Definition
minimum of 30 minutes after cessation of work. |
|
|
Term
According to the handout on TB#94 if there is functioning fire detection system the F.W. may be discontinued ___________.
If there is no functioning fire detection system the F.W. shall be maintained on a ______ |
|
Definition
30 minutes after completion of each work day.
24 hour basis |
|
|
Term
According to the handout on TB#94
Any work requiring use of an open flame shall require a FIRE WATCH standing by with a ________ size extinguisher. |
|
Definition
|
|
Term
According to the handout on TB#94
Smoking is NOT PERMITTED in a asbestos abatement are or within ____ feet of the area. |
|
Definition
|
|
Term
According to the handout on TB#94
All PARADE FLOAT decorations that are _______ in thickness or less shall be flame retardent. |
|
Definition
|
|
Term
According to the handout on TB#94
PARADE FLOATS
OPEN FLAME=prohibited unless approved by?
Smoke producing devices must be _______ type.
ALL FLOATS must have a ______ extinguisher readily accessible by the OPERATOR
|
|
Definition
Fire Chief in writing
NON heating
2A/10BC |
|
|