Term
What does part PG (of the ASME Code) applies too? |
|
Definition
General requirements for all methods of construction. |
|
|
Term
|
Definition
1 - General Provisions 2 - Power Boilers 4 - Heating Boilers 7 - Air tanks 9 - Refrigeration / AC 10 - Material Specifications 11 - Welding Specifications 15 - NBIC 16 - Controls / safety division 17 - Piping 18 - Continuing Education 19 - Portable Boiler |
|
|
Term
Boiler Auto Start Sequence |
|
Definition
1 - Set the Boiler to Manual / Low Fire 2 - Air register cycles to minimum 3 - prove fuel is shut (double block) and bleed open 4 - Forced draft on 5 - Air register open, purge for 8 air changes 6 - Air register to minimum 7 - Igniter fires than pilot lines open 8 - prove pilot 9 - main fuel open than prove main fuel 10 - pilot closes 11 - close vent 10-15psi 12 - turn to Auto at 50% operating pressure |
|
|
Term
Third Engineer Classification |
|
Definition
-To have charge of and operate a boiler or boilers not exceeding, in the aggregate, 150 Hp when solid fuel is burned -Or not exceeding, in the aggregate, 500 Hp when steam is generated by the use of liquid or gaseous fuel, electric or atomic energy or any other source of heat -And an engine or engines not exceeding 50 Hp each -or to operate a Second Class plant under the engineer in charge thereof. |
|
|
Term
What are the two safety valves requirements? |
|
Definition
Smaller must be at least ½ or greater the size of the bigger one. |
|
|
Term
What is furnace heat released |
|
Definition
amount of BTU produced per cubic feet of furnace volume per hour. |
|
|
Term
|
Definition
Double flow Opposed flow Balanced Piston |
|
|
Term
Minimum thickness for Boiler plates |
|
Definition
|
|
Term
Ways to prevent steam leakage in Steam Turbine |
|
Definition
|
|
Term
Two adjustments on safety valves and what must be done? |
|
Definition
Popping pressure / blowback Requires new name plate from manufacturer |
|
|
Term
Info about superheater safety valves |
|
Definition
must relieve first protects superheaters valve spring should be exposed for visual inspection so you dont have to take down the Boiler must be able to relieve at least 23% of reliving capacity ASME Section 1 |
|
|