Site Selection To do: Pick a LEED building or Options A-L |
|
|
Term
Name Options A-L for SS-1 |
|
Definition
A: Brown Field Remediation B: Storm Water Management C: Storm Water Treatment D: Heat Island Reduction, non-roof E: Heat Island Reduction, Roof F: Light Pollution Reduction G: Water Efficient Irrigation- Reduced Potable H: Water Efficient Irrigation- No Potable I: Innovative Wastewater Technologies J: Water use Reduction K: On-Site Renewable Energy L: Other Quantifiable Environmental Performance |
|
|
Term
|
Definition
Brownfield Remediation- Choose a Brownfield as site and do the remediation process PTS- 1/2 |
|
|
Term
|
Definition
Storm Water Management- Chose site with less than 50% impervious cover OR reduce by 25% PTS- 1/2 |
|
|
Term
|
Definition
Storm Water Treatment- Get rid of contaminants: TSS by 80% and TP by 40% (Total Suspended solid and total phosphorus) PTS-1/2 |
|
|
Term
|
Definition
Heat Island Reduction, Non-roof- 1. Choose building that provides shade, uses color with a SRI of at least 30, and an open-pavement grid that equals at least 30% of non-roof impervious surfaces OR 2. place 50% of parking underground or cover them OR 3. use open-pavement grid for at least 50% of parking area (CHOOSE UP TO 2) PTS- 1/2-1 |
|
|
Term
|
Definition
Heat Island Reduction, Roof- A minimum of roof should have an SRI great or equal to: low-sloped roof = 78 and high sloped roof= 29 OR installed a green roof for 50% of the surface area OR a combination of the two satisfying: roof area ≤(sf roof SRI x 1.33)+(sf of green roof x2) PTS- 1/2 |
|
|
Term
|
Definition
Light Pollution Reduction- Exterior lighting with more than 1000 lumens needs to have shielding, lamps with more than 3500 lumens have to comply with IESNA cutoff requirements, and lamp with 2.5 x mounting height of the property line must have shielding, and no light shall cross the property line. PTS- 1/2 |
|
|
Term
|
Definition
Water Efficient Irrigation- Reduced Potable- Reduce potable water for irrigation by 50% over conventional means (use drip method) or capture rain water PTS- 1/2 |
|
|
Term
|
Definition
Water Efficient Irrigation- No Potable Use only captured rain water or recycled site water for irrigation (graywater from dishwaher and showers only) MUST BE REUSED/RECYCLED PTS-1/2 |
|
|
Term
|
Definition
Innovative Wastewater Technologies- Reduce use of municipally provided water by 50% OR treat 100% of wastewater on-site EX: low flow toilet BASELINE PTS-1/2 |
|
|
Term
|
Definition
Water Use Reduction- Reduce water usage by 20% of the baseline standard BASELINE PTS-1/2 |
|
|
Term
|
Definition
On-site Renewable Energy- Building supplies at least 5% (of it's total annual energy cost) of energy through on-site renewale energy systems PVs, Biomass, cut cost- can sell back. PTS- 1/2, 1 |
|
|
Term
|
Definition
Other Quantifiable Environmental Performance- Think of and implement anything else with environmental performance characteristics. PTS: 1-3 |
|
|
Term
For the Water Reduction "J" what percentage of the baseline standard should be reduced? |
|
Definition
|
|
Term
What percentage of municipally provided water needs to be reduced to get the Innovative Wastewater Technologies credit? |
|
Definition
50% OR treat 100% of the wastewater on site. |
|
|
Term
For the Non-Roof credit, what should the SRI be? |
|
Definition
|
|
Term
For the Non-roof credit, what should the open-pavement grid equal? |
|
Definition
at least 30% of non-roof impervious surfaces |
|
|
Term
For Non-roof credit, what should the pecentage of underground parking be? |
|
Definition
|
|
Term
For the Non-roof credit, what should the ope-pavement grid option be? |
|
Definition
at least 50% of the parking area |
|
|
Term
For the Roof credit, what should the low-sloped and high-sloped SRIs be? |
|
Definition
low-sloped SRI= 78 high sloped SRI=29 OR install a green roof for 50% of the surface area OR some combo of the two |
|
|
Term
For Light Pollution Reduction, what amount of lumens requires shielding? |
|
Definition
|
|
Term
For Light Pollution Reduction, lamps with 3500 lumens or more need to: |
|
Definition
comply with IESNA cutoff requirements AND lamps with 2.5 x mounting height o the property line needs shielding |
|
|
Term
For Light Pollution Reduction, what can not happen? |
|
Definition
no light shall cross the property line |
|
|
Term
For Watter Efficient Irrigation- Reduce Potable, what percentage and what method need to be used? |
|
Definition
reduce potable water for Irrigation by 50% over conventional means (use drip method) OR capture rain water |
|
|
Term
For Water Use Reduction, what needs to be reduced? |
|
Definition
Reduce by 20% of the baseline standard |
|
|