SS-1 Description

Definition

Site Selection

 

To do: Pick a LEED building or Options A-L

Term
Name Options A-L for SS-1
Definition

A: Brown Field Remediation

B: Storm Water Management

C: Storm Water Treatment

D: Heat Island Reduction, non-roof

E: Heat Island Reduction, Roof

F: Light Pollution Reduction

G: Water Efficient Irrigation- Reduced Potable

H: Water Efficient Irrigation- No Potable

I: Innovative Wastewater Technologies

J: Water use Reduction

K: On-Site Renewable Energy

L: Other Quantifiable Environmental Performance

Term

SS-1

"A" Description

Definition

Brownfield Remediation-

Choose a Brownfield as site and do the remediation process

 

PTS- 1/2

Term

SS-1

"B" Description

Definition

Storm Water Management-

Chose site with less than 50% impervious cover OR reduce by 25%

 

PTS- 1/2

Term

SS-1

"C" Description

Definition

Storm Water Treatment-

Get rid of contaminants: TSS by 80% and TP by 40%

(Total Suspended solid and total phosphorus)

 

PTS-1/2

 

Term

SS-1

"D" Description

Definition

Heat Island Reduction, Non-roof-

1. Choose building that provides shade, uses color with a SRI of at least 30, and an open-pavement grid that equals at least 30% of non-roof impervious surfaces OR

2. place 50% of parking underground or cover them OR

3. use open-pavement grid for at least 50% of parking area

(CHOOSE UP TO 2)

PTS- 1/2-1

Term

SS-1

"E" Description

Definition

Heat Island Reduction, Roof-

A minimum of roof should have an SRI great or equal to: low-sloped roof = 78

and high sloped roof= 29

OR

installed a green roof for 50% of the surface area

OR

a combination of the two satisfying:

roof area ≤(sf roof SRI x 1.33)+(sf of green roof x2)

PTS- 1/2

Term

SS-1

"F" Description

Definition

Light Pollution Reduction-

Exterior lighting with more than 1000 lumens needs to have shielding, lamps with more than 3500 lumens have to comply with IESNA cutoff requirements, and lamp with 2.5 x mounting height of the property line must have shielding, and no light shall cross the property line.

PTS- 1/2

Term

SS-1

"G" Description

Definition

Water Efficient Irrigation- Reduced Potable-

Reduce potable water for irrigation by 50% over conventional means (use drip method) or capture rain water

 

PTS- 1/2

Term

SS-1

"H" Description

Definition

Water Efficient Irrigation- No Potable 

Use only captured rain water or recycled site water for irrigation (graywater from dishwaher and showers only)

MUST BE REUSED/RECYCLED

 

PTS-1/2

Term

SS-1

"I" Description

Definition

Innovative Wastewater Technologies-

Reduce use of municipally provided water by 50%

OR

treat 100% of wastewater on-site

EX: low flow toilet

BASELINE

 

PTS-1/2

Term

SS-1

"J" Description

Definition

Water Use Reduction-

Reduce water usage by 20% of the baseline standard

 

BASELINE

 

PTS-1/2

Term

SS-1

"K" Description

Definition

On-site Renewable Energy-

Building supplies at least 5% (of it's total annual energy cost) of energy through on-site renewale energy systems

 

PVs, Biomass, cut cost- can sell back.

PTS- 1/2, 1

Term

SS-1

"L" Description

Definition

Other Quantifiable Environmental Performance-

Think of and implement anything else with environmental performance characteristics.

 

PTS: 1-3

Term
For the Water Reduction "J" what percentage of the baseline standard should be reduced?
Definition
20%
Term
What percentage of municipally provided water needs to be reduced to get the Innovative Wastewater Technologies credit?
Definition

50%

OR

treat 100% of the wastewater on site.

Term
For the Non-Roof credit, what should the SRI be?
Definition
at least 30
Term
For the Non-roof credit, what should the open-pavement grid equal?
Definition
at least 30% of non-roof impervious surfaces
Term

For Non-roof credit, what should the pecentage of underground parking be?

Definition
50%
Term
For the Non-roof credit, what should the ope-pavement grid option be?
Definition
at least 50% of the parking area
Term
For the Roof credit, what should the low-sloped and high-sloped SRIs be?
Definition

low-sloped SRI= 78

high sloped SRI=29

OR

install a green roof for 50% of the surface area

OR

some combo of the two

Term
For Light Pollution Reduction, what amount of lumens requires shielding?
Definition
1000 lumens
Term
For Light Pollution Reduction, lamps with 3500 lumens or more need to:
Definition

comply with IESNA cutoff requirements

AND

lamps with 2.5 x mounting height o the property line needs shielding

Term
For Light Pollution Reduction, what can not happen?
Definition

no light shall cross the property line

Term

For Watter Efficient Irrigation- Reduce Potable,

what percentage and what method need to be used?

Definition

reduce potable water for Irrigation by 50% over conventional means (use drip method)

OR

capture rain water

Term
For Water Use Reduction, what needs to be reduced?
Definition
Reduce by 20% of the baseline standard