Term

IOP-3

 

Hot Standby to Min Load

Definition
Purpose: To provide Instuctions for Start up from Mode 3 to Mode 1(Power Operation)
Term
When Should Criticality Be Anticipated?
Definition

Any Time Rods are being Withdrawn or Dilution of Boron. ie. Positive reactivity.

 

Only one type of positive reactivity at a time is to be made

 

SUR Limit is <= .4 dpm Post refuel 1dpm for all other criticalitiies

Term
ICRR Stands for?
Definition

Inverse Count Rate Ratio or 1 over M Plot.

 

Predicts the point of criticality based on Estimated Critical Conditions (ECC)

1. > 300pcm <400... Eval by R.E. Reactor Pwr Cont.

2. >400 <500: R.E and S.M. Permission needed for S.U.

3. >500 < 1000: ECC recal, Rods Full in. 2nd time through Permission from R.E. and S.M. needed to continue S.U.

Term
Boration Limit between PZR and RCS Loops is?
Definition
< or = 50 ppm
Term
IOP-3 Paths...
Definition

Start up Preps...

 

  1. RCS Pressure NOP
  2. Tave 545-549
  3. 21-24 SG Levels 28-38% NR
  4. ECC completed  
Term
Paths Cont.
Definition
  1. Place SGFP in Service
  2. Select both SR to NR45
  3. Hold all plant evolutions that could effect criticallity
  4. Energize Rod control
  5. Chem to Sample RCS and PZR boron 
Term
What is Monitored during rod Withdrawl?
Definition

IRPI

Rod Bottom Lights

Group Step Counters

Term
Mode 2 is entered prior to pulling...
Definition
Control Bank A is imminent.
Term
Control Bank Hold Points...
Definition
  1. CBA fully Withdrawn
  2. RIL Position (58 steps on CBC)
  3. CBB Fully Withdrawn
  4. CBD at 50 or 8 Fold Rod position/ .125 ICRR/ 3 Doublings
  5.  CBD Limited to < 50 step incr.
  6. R.E. may recommend 25 Step Incr
  7. 10E-8 amps so subcritical multiplication and MTC and Dopler do not effect the NIS setpoint Data
Term
NIS overLap
Definition

SR/IR = 3-5 E5 amps

IR/PR = 4-6 E -6