Term
IOP-3
Hot Standby to Min Load |
|
Definition
Purpose: To provide Instuctions for Start up from Mode 3 to Mode 1(Power Operation) |
|
|
Term
When Should Criticality Be Anticipated? |
|
Definition
Any Time Rods are being Withdrawn or Dilution of Boron. ie. Positive reactivity.
Only one type of positive reactivity at a time is to be made
SUR Limit is <= .4 dpm Post refuel 1dpm for all other criticalitiies |
|
|
Term
|
Definition
Inverse Count Rate Ratio or 1 over M Plot.
Predicts the point of criticality based on Estimated Critical Conditions (ECC)
1. > 300pcm <400... Eval by R.E. Reactor Pwr Cont.
2. >400 <500: R.E and S.M. Permission needed for S.U.
3. >500 < 1000: ECC recal, Rods Full in. 2nd time through Permission from R.E. and S.M. needed to continue S.U. |
|
|
Term
Boration Limit between PZR and RCS Loops is? |
|
Definition
|
|
Term
|
Definition
Start up Preps...
-
RCS Pressure NOP
-
Tave 545-549
-
21-24 SG Levels 28-38% NR
-
ECC completed
|
|
|
Term
|
Definition
- Place SGFP in Service
- Select both SR to NR45
- Hold all plant evolutions that could effect criticallity
- Energize Rod control
- Chem to Sample RCS and PZR boron
|
|
|
Term
What is Monitored during rod Withdrawl? |
|
Definition
IRPI
Rod Bottom Lights
Group Step Counters |
|
|
Term
Mode 2 is entered prior to pulling... |
|
Definition
Control Bank A is imminent. |
|
|
Term
Control Bank Hold Points... |
|
Definition
- CBA fully Withdrawn
- RIL Position (58 steps on CBC)
- CBB Fully Withdrawn
- CBD at 50 or 8 Fold Rod position/ .125 ICRR/ 3 Doublings
- CBD Limited to < 50 step incr.
- R.E. may recommend 25 Step Incr
- 10E-8 amps so subcritical multiplication and MTC and Dopler do not effect the NIS setpoint Data
|
|
|
Term
|
Definition
SR/IR = 3-5 E5 amps
IR/PR = 4-6 E -6 |
|
|