RCS pressure is limited by Steam Generator ∆P until RCS temperature exceeds 510°F IAW TM.ZZ-0001, RCS Temperature - Pressure Curves.
When RCS pressure is greater than the SI Accumulator pressures, throttle and then open the SJ54s
PRIOR TO exceeding RCS pressure of 1000 psig:
· INITIATE PT.CAN-0001, Containment Walkdown.
· ENSURE 2CV114, Seal Bypass Flow Valve is CLOSED.
· ENSURE 23 Charging Pump Fluid Drive linkage is in the higher pressure position (top hole).
When PZR pressure >1700#, initiate Controlled Pressurization of PZR Safety Valves different from IOP-8
· On indication of leakage, reduce pressure to a known good pressure and soak for 1 hour
· <2235# for >48 hrs, or <1700# for shutdown
o 200#/hr raise to 2000 psig / 30 min soak
o 100# raise / 30 min soak, repeat 2200 to 2235 @ ≤70#/hr
· ≥1700 during the shutdown and <2235# for ≤48 hours
o ≤200#/hr
· Mind P-11
Test 23 AFP within 24 hours of exceeding 680°#
Ensure P-11 and P-12 automatically reinstate, or manually unblock
|