Term

SEC

(Safeguards Equipment Controls)

Purpose

Definition

Determines the need for SI and /or Blackout safety equipment

Loads the equipment onto the 4KV Vital Buses

 

 

Term

SEC

Safeguards Equipment Control

Solid State Protection system

 

Design Basis

Definition

1. Starts all Equipment required to keep the plant in a safe condition during: SI/BO or Both.

 

2. Shutdown can be achieved under all postulated AB conditions with at least 1 EDG available.

 

3. Each unit has a seperate and independent Power source to feed the SEC

 

4. Each EDG has their own SEC for all SEC Modes

Term
Power for the SEC is supplied from?
Definition

A cabinet: "A" 115VAC VIB

 

B cabinet: "B" 115VAC VIB 

 

C cabinet: "C" 115VAC VIB

 

SEC Power loss=No EDG auto Start

 

 

Term

Definition of undervoltage...

 

Definition of Degraded Voltage...

 

Definition of Blackout...

Definition

UV: Bus at or below 70% of Nominal Voltage

 

DV: Bus Voltage at or below 95.1% of Nominal Voltage (> 13 sec)

 

BO: Undervoltage condition on at least 2 of 3 4KV Vital Buses

Term
Name the SEC Modes , Causes and Sequencer.
Definition

Mode I = SI

 

Mode II = BO  (SEQ 1)

 

Mode II* = BO Single Bus (SEQ 1)

 

Mode III = SI + BO  (SEQ 2)

 

Mode IV= SI + Single Bus UV/DV (SEQ 2)

Term
What actions are common during ANY SEC Mode?
Definition

EDG Breaker Opens

 

EDG swaps to Isochronous Mode

 

SW to the TGA is Isolated via the SW20s or SW26 within 40sec

 

Chill water to PACUs and Chemistry RM Coolers Isolate

 

Lock out of "Manual Control" of all bus loads until Seq. is complete and SEC reset

Term
Name the Primary Service Water Pumps for SEC actuation.
Definition

SW21, SW24, and SW25

 

Alternate pumps will start 5 seconds later only if the primary pumps fail to start.

Term
In what SEC mode are the CCW Heat exchangers Isolated from Service Water?
Definition

Mode III

 

By Closing 11/21SW122, 22SW122, 1SW376 and 1SW380

Term
What restricted automatic Mode changes are allowed by the SEC without an operator reset of the SEC?
Definition

Mode I to Mode III

Mode I Mode IV

Mode II to Mode III

Mode II* to Mode IV

Term
State the actions of an automatic Mode Change...
Definition

1. SEC Stops SEQ.

2. Sequencer Currently in use resets.

3. All Loads previously started are shed and EDG Breaker opens.

4. EDG breaker closes and new sequenced loading for the mode begins.

 

Term
Sequence failure during Mode III and the EDG fails to start or EDG trips during loading... What actions must be taken to reset the SEC?
Definition

The SEC can NOT be reset until the SI signal is either reset or blocked and voltage is restored to the 4KV Vital Bus.

 

Restoration of the Vital Bus is NOT possible unless the SEC is De-energized.

Term
Configuration Duration for a SI reset is?
Definition
at least 74 seconds and the SEC must be reset.
Term
When can the SEC be reset?
Definition

1. SI is reset(74 seconds min.) or Blocked.

 

2. Re-energized associated 4KV Vital Bus.

 

3. SEC Loading Sequences completed for 10 sec.