Term
|
Definition
Create/Change/Display Material Master Record |
|
|
Term
|
Definition
Item category D (service) activates the service function and enables creation of a service specification and sets the value limits for unplanned services. |
|
|
Term
|
Definition
Vendor Master Maintenance w/o Company Code data |
|
|
Term
Collective Master Record (Vendor) |
|
Definition
Used for one-time vendors; no address or vendor specific information is stored, only manually entered in the purchasing document |
|
|
Term
What does a Vendor Account Group determine? |
|
Definition
- Type of # assignment (internal or external) - Status (one-time or not) - Field selection and sequence - Vendor subrange and plant specific data - Valid partner schemas |
|
|
Term
Several xxxxxxx ledgers roll up into a single xxxxxx xxxxxxxxxxx account. |
|
Definition
Several subsidiary ledgers roll up into a single G/L reconciliation account. |
|
|
Term
Where are Partner Roles found and what are they? |
|
Definition
In the Vendor Master record; Order Recipient, Supplier (GS), Invoicing Party (PI), Forwarding Agent |
|
|
Term
At what organizational levels can you view the MMR? |
|
Definition
Enterprise, Plant, and Storage location levels |
|
|
Term
What is the Industry Sector and where is it defined? |
|
Definition
Determines which fields appear and screen sequence; defined in the MMR |
|
|
Term
What does the Material Type determine? |
|
Definition
- Special purpose materials (configurable or process) - # assignment (internal or external) - # range - Screen selection and sequence - What data must be entered - In house or procured material |
|
|
Term
T/F To extend a material to a new plant or storage location (SLOC), use MM01. |
|
Definition
|
|
Term
What is copied when you create a new vendor master with reference to another? |
|
Definition
|
|
Term
|
Definition
Mass Material Maintenance (to update a field in a group of documents, master records, accounting objects, etc.) |
|
|
Term
|
Definition
An agreement with a vendor about price (PB00), discount (RA00), freight (FRA1), and customs (ZOB1) - maintained in PO, SA, PIR, Quotes |
|
|
Term
For which documents are conditions time independent? |
|
Definition
POs (SAs and RFQs can be either, but PIRs and contracts are always time dependent) |
|
|
Term
|
Definition
Group of condition types to determine effective price - can vary by Purchasing Org and Vendor |
|
|
Term
|
Definition
Create/Change/Display RFQ |
|
|
Term
|
Definition
Maintain RFQ (see vendor submissions) |
|
|
Term
T/F You can create multiple RFQs for the same item. |
|
Definition
True You would do this if you wanted to send individual requests to each vendor - tracked together with a collective RFQ number |
|
|
Term
|
Definition
Price Compare (processing RFQs) SAP automatically ranks the options, from this screen, you can convert the RFQ to a PR and send rejection notices |
|
|
Term
|
Definition
Create Purchase Requisition |
|
|
Term
|
Definition
Unique combination of Vendor, Plant, Purchasing Organization, and Material |
|
|
Term
|
Definition
Create/Change/Display PIR |
|
|
Term
|
Definition
|
|
Term
If no Price or Condition or exists in the PIR, where does the PO price come from and can you edit it? |
|
Definition
|
|
Term
|
Definition
If PIR is available at the plant level or the POrg level, it is updated. If it does not exist, it's created at the POrg level. |
|
|
Term
|
Definition
If plant conditions are allowed, the PIR at the plant level is updated or created. |
|
|
Term
|
Definition
If plant conditions are not allowed, the PIR at the POrg level is either created or updated. |
|
|
Term
At what levels can you valuate a material? Which is the SAP best practice? |
|
Definition
Company code or plant; best practice is plant. |
|
|
Term
What does the valuation class determine? |
|
Definition
Determines which accounts should get updated during goods movement. Use this to combine materials to the same G/L account so there isn't a separate account for each material. |
|
|
Term
|
Definition
Entered in the MMR and stock is valuated. Price difference income and expense accounts are created to account for mismatches between the standard price and order price. Stock account + Price Difference = GR/IR |
|
|
Term
|
Definition
Stock updated by order/invoice price. Stock account = GR/IR |
|
|
Term
GR/IR account always clears at the xxxxxx price. |
|
Definition
|
|
Term
You can only issue xxxxxxxx stock. |
|
Definition
You can only issue unrestricted stock. |
|
|
Term
Goods movement from QM to Unrestricted; is a material document created? |
|
Definition
|
|
Term
Goods movement from Unrestricted to QM; is a material document created? |
|
Definition
|
|
Term
Goods movement from Unrestricted to Blocked; is a material document created? |
|
Definition
|
|
Term
Goods movement from Blocked to Unrestricted; is a material document created? |
|
Definition
|
|
Term
Goods movement from QM to Blocked; is a material document created? |
|
Definition
|
|
Term
Goods movement from Blocked to QM; is a material document created? |
|
Definition
|
|
Term
What is included on a Material Document? |
|
Definition
Unique ID, year, material, quantity, movement type |
|
|
Term
What is included on an accounting document? |
|
Definition
Unique ID to year and company code, posting key, account, amount |
|
|
Term
|
Definition
Invoice Verification (both Material and Accounting documents created) |
|
|
Term
|
Definition
Special condition type (ie freight condition goes to a separate Freight Clearing account) |
|
|
Term
When are unplanned costs posted? |
|
Definition
|
|
Term
|
Definition
Procured for an account assignment object. |
|
|
Term
Give some examples of an account assignment object. |
|
Definition
Cost center, asset, project, production order, etc. |
|
|
Term
For consumable material orders, is an MMR required? |
|
Definition
No; but if there is one, there is NO value based inventory management |
|
|
Term
What does the Account Assignment Category (AAC) determine? |
|
Definition
- Category of account assignment object - What account assignment data must be provided - Which accounts are debited upon GR/IR |
|
|
Term
Give some examples of Account Assignment Categories (AACs). |
|
Definition
A - Asset K - Cost Center P - Project F - Production Order C - Sales Order |
|
|
Term
Stock vs Consumable Which requires an MMR? |
|
Definition
|
|
Term
Stock vs Consumable Which requires an AAC? |
|
Definition
|
|
Term
Stock vs Consumable Which requires valuated GR? |
|
Definition
|
|
Term
Stock vs Consumable Which does not update value in the MMR? |
|
Definition
|
|
Term
Where in the PR is the AAC specified? |
|
Definition
|
|
Term
If there are multiple account assignments for a single item, where can you determine the distribution? |
|
Definition
In the Attributes button - can allocate either Q or % to each account. |
|
|
Term
For Consumable Material PRs, can AAC 'U' be used? |
|
Definition
Yes, AAC can be 'Unknown', but must be specified in the PO |
|
|
Term
When must the valuated price be manually entered? |
|
Definition
When the MMR does not exist or if it is a nonvaluated material. |
|
|
Term
Where can you see how a PR was created? |
|
Definition
In the PR => Item Detail => Contact Person |
|
|
Term
|
Definition
|
|
Term
What is required to convert a PR to a PO? |
|
Definition
- Source of supply identified (or Vendor manually entered) - POrg and PGrp defined - Auto PO box in MMR and VMR checked |
|
|
Term
When copying data from a PR to a PO, when is valuated price NOT copied over? |
|
Definition
Valuated price is not copied if the PR line item is created with reference to a MMR (the system will suggest PIR price if valid, otherwise you must enter it manually) |
|
|
Term
In order to receive confirmations, what must be activated? |
|
Definition
|
|
Term
What events can you request confirmation for? Where is this information found? |
|
Definition
- Order acknowledgement - Loading confirmation - Shipping notification - Transportation details
Found in the Confirmations tab of the Item Detail |
|
|
Term
T/F For consumable material with a nonvaluated GR (or no GR), there is still a financial posting. |
|
Definition
|
|
Term
T/F A consumable material can have a valuated GR. |
|
Definition
True - but it is not required |
|
|
Term
What order type is a blanket PO? |
|
Definition
|
|
Term
|
Definition
- Limit on an item (used for Framework orders - blanket POs) - AAC 'U' allowed - No material # required - No GR or service entry |
|
|
Term
T/F In a blanket PO, you can have multiple account assignments. |
|
Definition
|
|
Term
What are 2 identifying factors in a Blanket PO? |
|
Definition
Use of validity periods and item limits. (Goods are issues and invoices posted until validity period expires or limit is reached) |
|
|
Term
What is the Item Category dependent upon and what does it control? |
|
Definition
Document type; Item Category controls: - Material # - Material stocked - Account assignement - GR - IR |
|
|
Term
Name some examples of Item Category. |
|
Definition
Blank - Standard B - Limit K - Consignment L - Subcontracting M - Material Unknown S - 3rd Party T - Text U - STO W - Material Group D - Services |
|
|
Term
|
Definition
Create/Change/Display Service Master Record |
|
|
Term
At what levels can you define a service? |
|
Definition
At the service, service + vendor + POrg, service + vendor + POrg + plant level |
|
|
Term
|
Definition
Display Total Price (Service) |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
What key items are in a Service PO? |
|
Definition
- Service master data - Service conditions - Service specifications - Limit for unplanned services |
|
|
Term
When are the FI accounts hit for service POs? |
|
Definition
Upon acceptance of the service (NOT saving of the service entry) |
|
|
Term
What are the 8 steps of the Procurement cycle? |
|
Definition
1. Determination of Requirements 2. Determination of source of supply 3. Vendor selection 4. PO Processing 5. PO Monitoring 6. GR 7. Invoice Verification 8. Payment Processing |
|
|
Term
What documents are included in the Discrete PO process? |
|
Definition
- PO/SO - GI/GR - Invoice/IR |
|
|
Term
T/F When an SC performs a service and returns the part, it gets a new part number. |
|
Definition
True (but Company always owns the part) |
|
|
Term
What is another term for Vendor Managed Inventory? |
|
Definition
|
|
Term
When do you use Consignment? |
|
Definition
When purchasing bulk parts or overhead items (ie gasoline) |
|
|
Term
When does Company take ownership of Consignment goods? |
|
Definition
Upon consumption (not responsible for freight or storage) |
|
|
Term
What does an STO replace in the Procurement process? (document type) |
|
Definition
It replaces the PO and SO. |
|
|
Term
In which type of STO is an invoice and IR NOT required? |
|
Definition
|
|
Term
Inventory Indirect Material |
|
Definition
Any material used for production not ina BOM |
|
|
Term
|
Definition
Reject goods and return to vendor |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
Enter Delivery Address MD |
|
|
Term
|
Definition
|
|
Term
|
Definition
Create production order with reference to Sales Order |
|
|
Term
|
Definition
Where used list to find elements in BOMs |
|
|
Term
|
Definition
Work Center where used list |
|
|
Term
|
Definition
|
|
Term
|
Definition
Create/Change/Display Sales Order |
|
|
Term
|
Definition
Create/Change/Display Vendor |
|
|
Term
|
Definition
Change Output - Condition Records |
|
|
Term
|
Definition
Change Output - Condition Records |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
Vendor Table (without/with company code) |
|
|
Term
|
Definition
Vendor with Purchasing Org table |
|
|
Term
|
Definition
Output Conditions List table (by Purchasing Document) |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
Run MRP for a single part |
|
|
Term
|
Definition
Shows stock and requirements for a given part |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
Copy the Vendors from one Company Code to another with identical settings |
|
|
Term
|
Definition
Select many to delete several lines at once |
|
|
Term
|
Definition
|
|
Term
|
Definition
- Stock situation - Goods movement - Identify inconsistencies in stock data |
|
|
Term
2 Reporting/Analysis tools in SAP |
|
Definition
SAP List Viewer and ALV Grid Control |
|
|
Term
The Logistics Data Warehouse specifies 3 types of information: |
|
Definition
Characteristics, periodicity, and key figures |
|
|
Term
What is the purpose of MRP? |
|
Definition
To make material available at the right time for consumption (monitors the stock situation and triggers procurement when necessary) |
|
|
Term
Put these in order: Convert, Planning Run, Planned Order |
|
Definition
Planning Run > Planned Order > Convert (MRP steps) |
|
|
Term
When can schedule lines be created directly from a planning run? |
|
Definition
Valid SA already exists AND MRP-relevant indicator is checked in the Source List |
|
|
Term
What are the 3 planning levels for MRP? |
|
Definition
|
|
Term
What is an MRP Area, what are the 3 types? |
|
Definition
Common area for which materials are planned; Group of SLOCs, Plant, SCs |
|
|
Term
CB vs MRP Used on high value, fluctuating demand materials |
|
Definition
|
|
Term
CB/MRP Based on both past and future information |
|
Definition
|
|
Term
CB/MRP Utilize the reorder point function |
|
Definition
|
|
Term
This determines the procedure for planning a material and the required parameters. |
|
Definition
|
|
Term
MRP, ROP, Forecast, and Time-based are examples of what? |
|
Definition
|
|
Term
|
Definition
- the MRP procedure - Forecast usage - if MRP is used regularly - SS and ROP calculations - Screen sequence |
|
|
Term
T/F MRP data is stored at the SLOC level |
|
Definition
T - however it can be defined at the plant level |
|
|
Term
There are 4 types of data in the MMR dealing with MRP: - xxxxxx - Data dependent on the xxx xxxxxxx - Data dependent on xxxxxxxxx - Data dependent on the xxxxxx calculation |
|
Definition
- General data - MRP procedure - Scheduling - Lot size |
|
|
Term
|
Definition
a collection of fields for configuration of the MMR (like a variant) |
|
|
Term
T/F - MRP Profiles When you update a profile, it runs a job to auto update any record using that profile. |
|
Definition
|
|
Term
Where is material status maintained for cross-plant usage? Single plant usage? |
|
Definition
Cross-plant - BASIC DATA 1 Single plant - MRP 1 |
|
|
Term
On Order Stock/Fixed Receipt Elements |
|
Definition
POs, Fixed Planned Orders, Fixed PRs - anything guaranteed to ship |
|
|
Term
ROP planning uses MRP stock which is the sum of xxx stock and xxxx stock. |
|
Definition
|
|
Term
If ROP > Warehouse Stock = Shortage or Surplus? |
|
Definition
|
|
Term
Work vs Calendar Delivery time |
|
Definition
Calendar (as defined in the SA or PIR) |
|
|
Term
Work vs Calendar time GR processing time, purchasing department processing time |
|
Definition
|
|
Term
|
Definition
Triggered by the ROP, not demand. |
|
|
Term
|
Definition
Part of the planning run filter - marked if there is a net change in the total horizon (will reset after planning run) |
|
|
Term
|
Definition
Part of the planning run filter, net change in the planning horizon (will reset after planning run) |
|
|
Term
Multilevel planning run includes what? |
|
Definition
Covers the BOM of the given material plus all BOMs under it |
|
|
Term
Planning Run Logic includes 5 steps: 1. Planning xxxx determines which materials to plan for 2. Net requirements calculation is based on xxxx and xx xxxx stock 3. Considers xx xxxxx procedures 4. Looks at xxxxx 5. If a requirement is short it triggers xxxx for in house parts and xxxx for external parts |
|
Definition
Planning Run Logic includes 5 steps: 1. Planning file determines which materials to plan for 2. Net requirements calculation is based on warehouse and on order stock 3. Considers lot sizing procedures 4. Looks at scheduling 5. If a requirement is short it triggers a planned order for in house parts and PR for external parts |
|
|
Term
|
Definition
lowest level a material appears in ANY product structure |
|
|
Term
What does the low level code control? |
|
Definition
The sequence in which a material is planned in the MRP run (the lower the LLC, the higher the material number) |
|
|
Term
What is the planning run processing key for a regenerative run (no filter, ignores indicators)? |
|
Definition
|
|
Term
Aside from the Processing Key (NEUPL, NETCH, NETPL), what parameters are set in a planning run? |
|
Definition
- Create PR indicator - Delivery Schedule lines indicator - MRP List indicator - Planning mode (how should procurement proposals for the last run be dealt with?) |
|
|
Term
In the Planning Mode parameter for the planning run, what are the 3 options? |
|
Definition
1. Adjust 2. Create New 3. Delete |
|
|
Term
T/F In the planning run, you can define an MRP group against a material type |
|
Definition
|
|
Term
|
Definition
Organizational object used for allocation of certain controls for MRP to a group of materials |
|
|
Term
T/F Plant parameters trump MRP Groups |
|
Definition
|
|
Term
What are Planning Results? |
|
Definition
Procurement elements (planned order, PR, SL) and the MRP list as a result of a planning run |
|
|
Term
Where can a user evaluate a planning run? |
|
Definition
The MRP list or the Current Stock/Requirements list (MD04) |
|
|
Term
Which is static and which is dynamic? MRP list and Current Stock/Requirements list |
|
Definition
Static - MRP List Dynamic - Current Stock/Requirements list |
|
|
Term
What are the 3 layouts of the Material Tree in the Stock/Requirements list? |
|
Definition
- Worklist (all materials in the current session) - Order (all assemblies and components of an MRP element) - Product Group (only available in collective mode) |
|
|
Term
What are the 3 types of lot sizing calculations? |
|
Definition
- Static (lot for lot, fixed, replenish to max) - Periodic (daily, weekly, monthly, planning calendar - for consumption based planning only) - Optimizing (part period balancing, least unit cost, Groff reorder) |
|
|
Term
Value (define as a multiple of X) and Profile (round up or down) are examples of what? |
|
Definition
|
|