Term
Your company is implementing the manufacturing execution component in PP. As part of the implementation team, you need to address the master data requirements to run manufacturing execution. What will be required? (5 answers) |
|
Definition
- Material - PRT - Workcenter - Routing - BOM |
|
|
Term
You are using SAP APO and you want to transfer routings from SAP ERP to SAP APO. In what forms are these routings transferred? (1 answer) |
|
Definition
Production process models (PPMs) |
|
|
Term
Your company opened a new facility to be used in manufacturing. You need to create a workcenter master record for this new facility so it can be used in manufacturing execution. What information can be maintained as part of the workcenter master record? (7 answers) |
|
Definition
- Basic data - Default values - Standard value key - Costs - Capacities - Scheduling - Cost center |
|
|
Term
A production order contains many different elements. A discussion ensues between you and your colleagues on what elements make up a production order. A list has been generated and you identify items that are NOT elements of a production order. Which of the following are not? (2 answers NOT, 8 ARE) |
|
Definition
NOT: - networks - scheduling ARE: - settlement rule - planned and actual costs - operations sequences - capacity splits - material components - PRTs - trigger points - documents |
|
|
Term
You are ready to begin production and need to issue materials to the production order. Upon doing so, SAP performs what actions? (5 answers) |
|
Definition
- Reservation is reduced - Quantity and value in material master is updated - Consumption account is debited - CO document created - FI document created |
|
|
Term
Your organization is using SAP ERP Manufacturing Execution. You are explaining the master data that supports the Manufacturing Execution process. What is the purpose of a routing? (1 answer) |
|
Definition
Lists sequence of steps for producing a material |
|
|
Term
Workcenters include what type of data? (5 answers) |
|
Definition
- Basic data - Capacities - Scheduling - Costing - Standard parameters |
|
|
Term
What accounts are affected when materials are issued to a production order? (2 answers) |
|
Definition
- Raw material stock account - Consumption account |
|
|
Term
The Kanban production type does not run with MRP. (True/False) |
|
Definition
|
|
Term
Master data for manufacturing consist of: (CATA-4 answers) |
|
Definition
- BOM's - PRT's - Material Master - Workcenter |
|
|
Term
BOM's are used in: (CATA- 3 answers) |
|
Definition
- MRP - Product costing - Procurement |
|
|
Term
Basic data for the Workcenter master records are maintained on which level? (1 answer) |
|
Definition
|
|
Term
In production execution, the availability check, checks for: (CATA-3 answers) |
|
Definition
- components - capacities - PRT's |
|
|
Term
In Cost object Controlling (COC), order settlement does what? (1 answer) |
|
Definition
|
|