Term
RPV Inst
Describe reference leg indications for failures. |
|
Definition
-Break: Level fails high. -Prassure fails: fails low. |
|
|
Term
RPV Inst
Describe variable leg indications for failures. |
|
Definition
-Break: fails low. -Pressure: remains unaffected. |
|
|
Term
RPV Inst
Describe the reference leg location. |
|
Definition
-Outside drywell in Rx building. |
|
|
Term
RPV Inst
Describe the hot calibrated instruments and indicated levels. |
|
Definition
-Safeguards: -50" to +50". -Feedwater: 0 to +60". -Core flood: -335" to +65". |
|
|
Term
RPV Inst
Describe the cold calibrated instruments and indicated levels. |
|
Definition
Vessel flood: -50" to +350". |
|
|
Term
RPV Inst
Describe the backfill flow indicator power supply. |
|
Definition
|
|
Term
RPV Inst
Describe the reason for backfill. |
|
Definition
-Notching: during depressurizing conditions, gasses leave solution and form bubbles causing the density to decrease and cause higher than actual level indications. |
|
|
Term
RPV Inst
Describe the backfill system and rated flow. |
|
Definition
-8 lbm/hr (.016 gpm). -Metering valves set to 3lbm/hr (.006 gpm). -From CRD (pure water and low oxygen). |
|
|
Term
RPV Inst
Describe the Rx high pressure SCRAM setpoint. |
|
Definition
|
|
Term
RPV Inst
Describe the Rx low pressure setpoint and what happens. |
|
Definition
-420 psig if in coincidence with -47". -Will start LP ECCS pumps and open associated injection valves. |
|
|
Term
RPV Inst
Describe the Rx press HI/LO setpoints. |
|
Definition
-1025 psig HI. -900 psig LO. |
|
|
Term
RPV Inst
Describe the reactor water level HI/LO setpoints. |
|
Definition
-LO: +30" with 3 second time delay. -HI: +40" |
|
|
Term
RPV Inst
Describe the Rx low level scram setpoint and logic. |
|
Definition
-Set at +9". -1 out of 2 taken twice. |
|
|
Term
RPV Inst
Describe the Rx low low water level setpoint and what happens. |
|
Definition
-Set at -47". -Trip recirc drive motor. -Group 1 and 3 isolation. -Start HPCI, RCIC, EDGs, and CS. |
|
|
Term
RPV Inst
Describe the Rx High water level trip and what happens. |
|
Definition
-Set at +48". -Trips main turbine and RFPs. |
|
|