Term
What does a tour consist of? |
|
Definition
Going to tended units -Talking to the SDO/EDO/DCPO -Inspect on-going jobs -Ensure personnel are following safety precautions Walk the pier/ERF for cleanliness |
|
|
Term
|
Definition
Off going RDC will complete a meal survey on breakfast everyday to be turned in at * o'clock reports. |
|
|
Term
|
Definition
RDC will complete everyday to be turned in at 8 o'clock reports |
|
|
Term
|
Definition
After the 2000 meeting call the PMA and report status of on-going jobs. |
|
|
Term
|
Definition
Muster reports are due by 0830 (RDO's may have to assist with gathering muster reports) |
|
|
Term
What does Squadron provide? |
|
Definition
(1)Emergency Diesel Generator (2)Pure Water (3)Refer on the pier (4)Squadron deals with Port Ops(All services for pulling in) |
|
|
Term
|
Definition
(1)Diving on the Frank Cable or Unit along side (2)RAM transfers (3)Working past 2200 (4)Weapons Handling (5)Radiography |
|
|
Term
|
Definition
Contracts Port Services to DZSP |
|
|
Term
|
Definition
Contr4act services, cranes, electrical power, water, CHT |
|
|
Term
|
Definition
Floating cranes(the only ones that have one), contract services, staging, tiling, port services, HPAC, LPAC |
|
|
Term
|
Definition
Contract services, staging |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
R1 Ship-fitter (Structural Welding) |
|
|
Term
|
Definition
|
|
Term
|
Definition
R1 Weld Shop (Pipe Welding) |
|
|
Term
|
Definition
R1 Pipe Shop (Braze/Hydro Lance) |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
R1 Corrosion Control (Power Coat) |
|
|
Term
|
Definition
R1 Sail Loft/Canvas (Naugahyde) |
|
|
Term
|
Definition
R2 Inside Machine Shop (MFR/Minor Machining) |
|
|
Term
|
Definition
R2 Engraving Shop (Plastic and Brass) |
|
|
Term
|
Definition
R2 Locksmith (X08/X09 Locks) |
|
|
Term
|
Definition
|
|
Term
|
Definition
R2 Valve Shop (Repair and Hydro) |
|
|
Term
|
Definition
R2 Engine Shop (31D Assist) |
|
|
Term
|
Definition
R2 Hydraulics (Hydraulics and Air/Hydro) |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
R2 A/C & R Shop (O2/N2 Charge) |
|
|
Term
|
Definition
|
|
Term
|
Definition
R2 Deck Repair (Tile Replacement/Lawn Matting) |
|
|
Term
|
Definition
R4 Electrical Repair (Motor Rewind/ Flash Arrestors) |
|
|
Term
|
Definition
R4 Outside Electrical (SSMG/Stoning) |
|
|
Term
|
Definition
R4 Rubber and Plastics (Plastisol/Plexiglas/Fiberglass) |
|
|
Term
|
Definition
R4 Tool Issue/Electrical Safety |
|
|
Term
|
Definition
R4 Optical Shop/ Mast and Antenna Shop(Periscopes/ Race Tracks, Mast Clamps, Hoist Cylinders, Mast Replacements) |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
R4 Electronics/PC Repair/2M (2M/Copiers) |
|
|
Term
|
Definition
R4 Electrical Calibration (Electrical Gauges) |
|
|
Term
|
Definition
R4 SONAR (NMH, Towed Arrays, Hydrophones) |
|
|
Term
|
Definition
R4 Mechanical Standards (Torque Wrenches and Gauge Cal) |
|
|
Term
|
Definition
|
|
Term
|
Definition
R5 Nuclear Repair (OI 55 Test/Pure Water) |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
When does diving require TYCOM Permission? |
|
Definition
Diving within 24 hours of shut down |
|
|
Term
who must be notified prior to diving operations? |
|
Definition
RDO, CDO, MOOW, Tended Units (SDO/EDO) |
|
|
Term
How many qualified divers must be on hand for underwater operations? |
|
Definition
|
|
Term
What is the recompressions chamber used for? |
|
Definition
Decompression Sickness and AGE (Arterial Gas Embolism) |
|
|
Term
What happens while a boat is critical? |
|
Definition
R5 conducts surveys from the pier |
|
|
Term
What are the major steps in the Reactor/Radiological accident check-off list? |
|
Definition
1. Call Away 2. Secure Area 3. Evacuate Injured 4. Isolate/Stop Spill 5. Contaminated personnel to DECON station |
|
|
Term
What are the functions and responsibilities of the Radiological Control Shift Supervisor (RCSS)? |
|
Definition
-Over all in charge of Radiological work on the water front. -In Charge of operations in NSF -Tour the work site every 8 hours |
|
|
Term
Who must be notified prior to moving RAM? |
|
Definition
CO, CDO, Base CO if of ship, 1MC Announcements |
|
|
Term
Who do you notify in a radiological emergency? |
|
Definition
RCO (Radiological Controls Officer) RCSS(Radiological Controls Shift Supervisor) |
|
|
Term
|
Definition
Ensure Submarines are able to resurface when they want to |
|
|
Term
|
Definition
Has the QA-9s, outstanding DFS, and LARs. Given to the sub at the end of the maintenance period before getting underway. |
|
|
Term
What are the procedures for opening and closing a Re-entry Control Form (REC)? |
|
Definition
Using a QA Form 9 (MCR) Maintenance Certification Record. Signature Spot 15C for SUBSAFE or nuclear work. Signature spot 15D "prime approver" for work on the sub gets signed by the units SDO. |
|
|
Term
Scope of Certification (SOC) and it's levels. |
|
Definition
Provide max reasonable assurance the DSS personnel are not imperiled during system operation. MCD-A: Death if fails MCD-B: Evacuation/Resurface if fails MCD-C: Anything not covered under A&B |
|
|
Term
|
Definition
|
|
Term
|
Definition
Material Downgrade or Reject tag |
|
|
Term
What are the requirements for hydrostatic testing? |
|
Definition
QA 26/28. Test rig will have a master test gauge and a backup system gauge range (S9505-AG-MMA- REV 3 TABLE 2 PG 29)(50-90% if not on table). Gauge range shall not exceed 100% of test pressure unless test pressure is below 60. 1 manual and 1 automatic relief valve. Automatic set point is 10% of test press. or 100 PSI above test press which ever is less. |
|
|
Term
What services can the tender provide to a unit? |
|
Definition
Power, CHT, Potable Water, flushing water, cranes |
|
|
Term
Which non-departmental watches are repair department personnel required to stand? |
|
Definition
Topside, ECP, Bag watch, OOD, COG, Duty Driver |
|
|
Term
Who may not leave the ship for any reason while in duty status? |
|
Definition
Fire Party (unless relief is provided) |
|
|
Term
Who must be notified in the event that a person must be removed from the watch bill to work? |
|
Definition
Section Leader Watch Bill Coordinator |
|
|
Term
Where is the Repair Department's watch bill posted? |
|
Definition
|
|
Term
How are various special requests handled after working hours? |
|
Definition
You will never make a promise you can't keep Cannot authorize overtime or anything for money. |
|
|
Term
Who's permission do you need to work past 1800, 2000 and 2200? |
|
Definition
1800 RDO/PMA 2000 RO 2200 CO |
|
|
Term
What are the procedures for processing work requests? |
|
Definition
Ship 3MC to Squadron to Ship Sup to Planning to Division |
|
|
Term
What are your requirements for Emergency November? |
|
Definition
Go to R5 classroom with all keys and support as necessary. |
|
|
Term
Who do you report a Safety Mishap to? |
|
Definition
If it deals with personnel-RMC/RO If it deals with equipment of job critical personnel- PMA |
|
|
Term
What are your actions in a security violation? |
|
Definition
|
|
Term
What are your actions for power outage? |
|
Definition
Check on Sub's by talking to their SDOs |
|
|
Term
What are your actions for flooding on tended units? |
|
Definition
Muster people onboard on the pier |
|
|
Term
What are your actions for destructive weather alert (Typhoon)? |
|
Definition
ERF Clean-up (strap down/ sand bag) 25D Clean pier Get water trailer ready |
|
|
Term
What are you actions for fire on tended units? |
|
Definition
Muster people onboard on the pier |
|
|