Term
Rad Waste
Describe the containment isolation valves and what happens on signal. |
|
Definition
-The drywell equipment drain sum and drywell floor drain sump pump suction valves are containment isolation valves. -Shut on group II. -This will also trip the pumps. |
|
|
Term
Rad Waste
Describe the pumps with essential power supplies. |
|
Definition
-Rx building floor drain sump pumps: MCC-133/143. -RHR room ECCS pumps: MCC-133/143. |
|
|
Term
Rad Waste
Describe the drywell equipment drain sump recirc. |
|
Definition
-If temp gets to 140F pump starts and recircs through a heat exchanger. -HX cooled by RBCCW. |
|
|
Term
Rad Waste
Describe the drywell floor drain sump and equipment drain sump level alarms. |
|
Definition
|
|
Term
Rad Waste
Describe where the condensate drip tank discharges to. |
|
Definition
-Goes to the condenser if < or equal to 1umho conductivity and discharge pressure >10#. -If not it goes to rad waste. |
|
|
Term
Rad Waste
Describe the ECCS area sump pumps alarm and starts. |
|
Definition
-Alarm at 4". -2 pumps start at 6" and stops at 4". -Other 2 pumps start at 8" and stops at 4". |
|
|