Term
|
Definition
The "throughput", or number of units a facility can hold, receive, store, or produce in a period of time. |
|
|
Term
|
Definition
The theoretical maximum output of a system in a given period under ideal conditions. |
|
|
Term
|
Definition
The capacity a firm can expect to achieve, given its product mix, methods of scheduling, maintenance, and standards of quality. |
|
|
Term
|
Definition
Actual output as a percent of design capacity. |
|
|
Term
|
Definition
Actual output as a percent of effective capacity. |
|
|
Term
|
Definition
A means of determining throughput capacity of workstations or an entire production line. |
|
|
Term
|
Definition
The limiting factor or constraint in a system. |
|
|
Term
|
Definition
The time of the longest (slowest) process; the bottleneck. |
|
|
Term
|
Definition
The time it takes for a product to go through the productions process with no waiting. |
|
|
Term
Theory of constraints (TOC) |
|
Definition
A body of knowledge that deals with anything that limits an organization's ability to achieve its goals. |
|
|
Term
|
Definition
A means of finding the point, in dollars and units, at which costs equal revenues. |
|
|
Term
|
Definition
A means of determining the discounted value of a series of future cash receipts. |
|
|