MR Credit 3.1 Resource Reuse |
|
Definition
Use salvaged, refurbished, or used materials for at least 5% of building material by value PTS 1 |
|
|
Term
MR Credit 3.2 Resource Reuse |
|
Definition
Use salvaged, refurbished, or used materials for at least 10% of building material by value PTS-2 |
|
|
Term
What does Resource Reuse exclude? |
|
Definition
Furniture and Furnishings Just building not the stuff in the building. |
|
|
Term
Consider salvaged materials such as beams and post, flooring paneling, doors and frames, cabinetry, brick and decorative items. |
|
Definition
|
|
Term
These reused components may continue to serve their original function, but underwent refurbishement to become functional. An example of this would be: |
|
Definition
refurbished door hardware |
|
|
Term
The salvaged materials from both on-site and off-site can be applied to MR Credit 5, Regional Materials, if they comply with the requirements of that credit. Materials qualifying as reused for MR Credit 3.1 and 3.2 cannot be applied to the following credits: |
|
Definition
MR 1.2, 1.3, 2.1, 3.3, 4.1, 4.2, 6 or 7. |
|
|
Term
Reused or Salvaged Materials |
|
Definition
include recovered construction materials reused in the project. Common salvaged materials include structural beams and postos, flooring, doors, cabinetry, brick and decorative items. Items that were never placed into service, but are being re-sold, are not salvaged materials. |
|
|
Term
|
Definition
include those materials that have been restored to serve in place of a new item. The refurbishing typically includes replacement of worn and non-functioning parts, and possibly refinishing. |
|
|
Term
MR 3.3 Resource Reuse 30% Furniture and Furnishings |
|
Definition
Use salvaged, refurbished or used furniture for at least 30% of total furniture budget PTS-1 |
|
|
Term
What can be exluded from furniture list? |
|
Definition
Artwork, interior plants and musical instruments |
|
|
Term
With justification, the project ream may use_____________________ greater than the amount paid for newly acquired refurbished product. |
|
Definition
|
|
Term
When the determinations are being based on ______ new products, consider using the discounted contract prices as opposed to the published list price. |
|
Definition
|
|
Term
|
Definition
is the estimated cost that the project team establishes for the product reused on the project. It may be equal to the cost of the same quantity of new product. When the exact product is no longer available, establish cost based upon the use of products with comparable features. |
|
|
Term
|
Definition
presumed to be less than replacement value, equating either to the amount that was or would ahve been paid for the acutal reused materials. |
|
|