Shared Flashcard Set

Details

MEP
MEP note for ARE
11
Architecture
Professional
02/27/2009

Additional Architecture Flashcards

 


 

Cards

Term
Life Cycle
Definition
life cycle cost = investment + maintainance and repair cost + (amortization cost) + operating cost (incl operating and labor)
Term
envelope interchange energy as:
Definition
connector, filter, barrier, switch. also emerging as a TRANSFORMER
Term

distance X2

source power x2

mass x2

Definition

distance X2 = +6db

source power x2 = +3db

mass x2 = - 6db

Term
DF (Daylight Factor)
Definition
DF= daylight indoor illuminance/ outdoor overcast daylight illuminance X 100%
Term
(SSF) solar saving fraction
Definition
to evalute a building's splar heating erformance. Not %. more of a measure o the solar's conservation advantage.
Term
specific volum in air
Definition
a # of HOT air has more volum than a# of COLD air.
Term
Net Saving
Definition
= lifecycle savings - lifecycle cost
Term
Internal Rate of Return (IRR)
Definition
Term
Payback Period
Definition
Term
initial rate of return
Definition
= annual saving/investment
Term
Absorption Coefficient (SABIN)
Definition
The % of incoming energy that is absorbed. In measuring radiant energy (light or heat) it’s a unitless ration that may vary depending on wavelength. In acoustics, it’s called a SABIN and may vary depending on frequency.
Supporting users have an ad free experience!