Term
|
Definition
Unit:each time a unit is produced
Batch: each time a batch is handled, regardless of units
Product: specific product, regardless of batches
Customer: specific customers
(i.e. sales calls, mailings, tech)
Organization: carried out regardless of which
customer is served
|
|
|
Term
|
Definition
costs accumulated that relate to a single activity measure |
|
|
Term
|
Definition
a costing method that is designed to provide managers with cost information for decisions that potentially affect capacity (therefore fixed and variable costs) |
|
|
Term
|
Definition
an allocation base in an activity-based costing system
"cost driver"
Transactional and Durational |
|
|
Term
|
Definition
count of the number of times an activity occurs
(e.g. number of bills, magezines, etc.) |
|
|
Term
|
Definition
the amount of time it requires to perform an activity
(e.g. time spent preparing bills, writing/printing magezines) |
|
|
Term
|
Definition
assigning functionally organized overhead costs derived from a company's general ledger to the activity cost pools.
Assign overhead costs to activity cost pools |
|
|
Term
Stage 1 Allocation:
Calculating activity rates |
|
Definition
divide total cost of the activity by total activity
total cost / overhead cost = activity cost pool |
|
|
Term
|
Definition
Assign overhaed costs to cost objects (products and customers) based on activity rate
acvtivity rate x activity = ABC Cost |
|
|
Term
|
Definition
sales - (direct costs + activity cost pools)=
PROFIT MARGIN |
|
|
Term
|
Definition
sales - (direct costs + acvivity costs + Cust relations) =
Customer Margin |
|
|
Term
|
Definition
based on a planned level of activity
variable cost x quantity planned |
|
|
Term
|
Definition
Use actual level of activity but with planned costs
allow variable costs and revenues to vary
|
|
|
Term
|
Definition
Planned budget - Flexible budget= activity variance |
|
|
Term
Revenue/Spending Variance |
|
Definition
actual - flexible budget = variance |
|
|
Term
|
Definition
use either units or COGS, add desired ending inventory and subtract expected beginning inventory |
|
|
Term
|
Definition
lists the number of units that must be produces to satisfy sales needs to provide for the desired ending inventory.
budgeted unit sales, add desired ending inventory finished goods and subract begining inventory of finished goods
(units only) |
|
|
Term
|
Definition
cash balance beginning, add receipts and subtract disbursements
eqaul to cash available for disbursements
if below min balance-borrow
if not-repay outstanding |
|
|
Term
|
Definition
= flexible budget cost
=standard price per unit x standard quantity per unit
=standard rate per hour x standard hours per unit |
|
|
Term
Direct Material standards |
|
Definition
stdrd price per unit:
reflect the final delivered cost of direct materials
stdrd quantity per unit:
reflects the amount of material required to for each unit of finished product as well as an allowance for unavoidable wate. (e.g. waste, spoilage, rejects,etc.) |
|
|
Term
|
Definition
stdrd rate per hour:
includes hourly wages, employment taxes and fringe benefits
stdrd hours per unit:
the labor time require to complete a unit of production |
|
|
Term
total variance (per input) |
|
Definition
=actual cost - standard cost
|
|
|
Term
materials quanity variance
labor efficiency variances |
|
Definition
=(act qt used x stdrd price)-(stdrdqt used x stdrd price)
=(act hrs x stdrd rate)-(stdrd hrs x stdrd rate) |
|
|
Term
materials price variance
labor rate variance |
|
Definition
=(act qt x act price)-(act qt x stdrd price)
=(act hrs x act rate)-(act hrs x stdrd rate) |
|
|
Term
|
Definition
=budgeted fixed costs / hours |
|
|
Term
|
Definition
=act fixed ovrhd - bdgt fixed ovrhd
|
|
|
Term
|
Definition
=bdgt fixed ovrhd - (stdrd rate/hr x stdrd hours/unit) |
|
|