Term
Bosses like to know was is going on, but they don't want to be bothered with... |
|
Definition
|
|
Term
All of the supervisory dutys and responsibilities can be groupoed into four common major areas: |
|
Definition
|
|
Term
Preperation, what is the acronym?
MRC |
|
Definition
Maintenance Requirement Cards |
|
|
Term
Preperation, what is the acronym?
ICE |
|
Definition
Internal Combustion Engine |
|
|
Term
This manual contains guidance for diesel engine operating hour overhaul intervals. |
|
Definition
|
|
Term
Who are the final authorities for determining the timing of overhauls and may elect to change the intervals. |
|
Definition
Maintenance and Logistics Command Atlantic/Pacific |
|
|
Term
What manuals would you find information on: Determining the timing/intervals of overhauls based on the condition of the engine. |
|
Definition
NEM-Naval Engineering Manual
&
COMDTINST M9000.6 |
|
|
Term
3 fold question
At what % of operating hour interval(top-end or center section) does WHO access the condition of the engine as per which manuals?
|
|
Definition
- 80%
- supervisor
- NEM, COMDTINST M9000.6, Chapter 233
|
|
|
Term
Preperation, what is the acronym?
NESU
|
|
Definition
Naval Engineering Support Unit
|
|
|
Term
Preperation, what is the acronym?
MAT |
|
Definition
|
|
Term
Preperation, what is the acronym?
MLC |
|
Definition
Maintenance and Logistics Command Atlantic/Pacific |
|
|
Term
Preperation, what is the acronym?
NEPL |
|
Definition
Naval Engineering Projects List |
|
|
Term
Adjustments to overhaul intervals shall be recorded in the cutters: |
|
Definition
NEPL(Naval Engineering Prjects List)
|
|
|
Term
Preperation, what is the acronym?
LRMP
|
|
Definition
Long Range Maintenance Plan |
|
|
Term
Who provides the cutter with specific guidance, such as any limitaions on operating the engine and the plan for monitoring and reassessing the enginge's condition? |
|
Definition
MLC
(Maintence and Logistics Command Atlantic/Pacific) |
|
|
Term
Who has total responsibility serving as the final quality assurance point or approving official for overhauls performed by MAT or commercial contractors? |
|
Definition
|
|
Term
How often shall the supervisor conduct progress meetings with all key personel?
Who do they provide prgress reports to? |
|
Definition
|
|
Term
The supervisor is responsible for establishing and mainting a project file of all relevent documents to an engine overhaul.
There are 07 examples, provide some.
How long are they maintened?
|
|
Definition
Critical measurements Technical reprentative reports major component replacements photos parts lessons learned reports
*kept on board until next overhaul |
|
|
Term
The supervisor is responsible for ensuring that the completion of the overhaul is documented in: |
|
Definition
|
|