SSp1 - Prerequisite 1 What is the SS Prerequisite 1 INTENT? |
|
Definition
SSp1 Control Erosion to reduce negative impacts on water and air quality |
|
|
Term
SSp1 What are the SSp1 REQUIREMENTS? |
|
Definition
Design site specific sediment and erosion control plan conforming to 2003 EPA Construction General Permit OR local erosion and sedimentation control codes, whichever is most stringent |
|
|
Term
SSp1 What are the SSp1 SUBMITTALS? |
|
Definition
Provide the LEED Letter Template and a summary of measures utilized. |
|
|
Term
SSc1 - Site Selection What is the SSc1 INTENT? |
|
Definition
SSc1 Avoid development of inappropriate sites and the environmental impact from the location of a building site. |
|
|
Term
SSc1 What are the SSc1 REQUIREMENTS? |
|
Definition
SSc1 Do not develop building, harscape, road and parking on: * Prime Farmland * Land which has an elevation lower than 5 feet below the elevation of 100-year flood 8 Land specifically identified as habitat for any Federal or State threatened or endangered animal lists * Within 100 feet of any wetland * Within 50 feet of any body of water * Within any parkland unless a swapped with a better value property. |
|
|