Term
What does "WE" stand for? |
|
Definition
|
|
Term
When is the critical decision points for Credits WE 1.1 and 1.2? |
|
Definition
Building Selection and Leasing Negotiations |
|
|
Term
What is the requirement for credit WE 1.1 Water Use Reduction? |
|
Definition
Use 20% less water ten the water baseline calculated for the tenant space (not including irrigation) after meeting the Energy Policy Act of 1992 fixture performance requirements. |
|
|
Term
Who Submits credit WE 1.1 and WE 1.2? |
|
Definition
the MEP engineer or other responsible party |
|
|
Term
What else needs to be provided besides the template for credit WE 1.1 and WE 1.2? |
|
Definition
a spreadsheet calculation demonstrating that the water consuming fixtures reduce the water by 20% or 30% (based on the credit submitted) |
|
|
Term
What does credit WE 1.2 require? |
|
Definition
the same as WE 1.1, but it must be a 30% reduction |
|
|
Term
What are the EPACT 1992 fixture ratings? - Water closet
- Urinals Showerheads
- Faucets
- Replacement Aerator
- Metering Faucets
|
|
Definition
- 1.6 GPF
- 1.0 GPF
- 2.5 GPM
- 2.2 GPM
- 2.2 GPM
- 0.25 Gal/cy
|
|
|
Term
What are the factors in the design case calculation for credit WE 1.1 and 1.2? |
|
Definition
Fixtures, Daily use, flow rate (GPM), duration (sec or flush), occupant users, sewage generation (gal) |
|
|
Term
What is the requirement for the EP and ID credits within for Water Efficiency? |
|
Definition
EP credit is for a 40% water reduction in regulated fixtures. The ID credit is for at least a 10% reduction in EPACT non-regulated fixtures. |
|
|
Term
|
Definition
|
|
Term
What does the EA prerequisite 1 require? |
|
Definition
- Designate an individual as the Commissioning Authority that is not involved in the design or project mgmt.
- Document the ower's project requirements for the projects energy related systems
- Develop and incorporate commissioning requirements into the CD's
- Develop and utilize a commissioning plan
- Verify that the installation and performance of energy consuming systems meet the owner's project requirements and basis of Design.
- Complete commissioning report
|
|
|
Term
If it is included in the tenant scope, what needs to at least be included in the commissioned systems for EA prerequisite 1? |
|
Definition
HVAC&R, lighting controls (daylighting included), domestic hot water system, renewable energy (PV, wind, solar...) |
|
|
Term
What is needs to be submitted besides the template for EAp1? |
|
Definition
A narrative and diagrams indicating how the HVAC system works, what is shared with other tenants, what the project scope is, and if the improvements were made to any common building system supplying the tenant area. |
|
|
Term
What standard do you need to comply with to meet the requirements of EA prerequisite 2? |
|
Definition
ANSI/ASHRAE/IESNA Standard 90.1-2004 or the local energy code (whichever is more stringent |
|
|
Term
Who is responsible for the EA prerequisite 2 submittals? |
|
Definition
engineer, architect, or responsible party. |
|
|
Term
What is the scope of the ASHRAE 90.1-2004? |
|
Definition
Sec. 5 Building Envelope Sec. 6 HVAC Sec. 7 Service Water Heating Sec. 8 Power Sec. 9 Lighting Section 10 Other Equipment |
|
|
Term
What is the EA prerequisite 3 called? |
|
Definition
CFC Reduction in HVAC&R Equipment |
|
|
Term
What does the EAp3 require? |
|
Definition
zero use of CFC-based refrigerants in new tenant HVAC&R systems when within the scope of work. |
|
|
Term
How can you earn ID credits for EAp3? |
|
Definition
demonstrating that they have eliminated the use of ODP's or materials with GWP's from their project |
|
|