Construction Activity Pollution Prevention
No points
Storm Water Management for Construction Activities Chapter 3 (US EPA)
no calcs
no extra credit
Construction submittal |
|
|
Term
|
Definition
Site Selection
1 Point
US Dept of Agriculture Definition of Prime Agricultural Land as stated in USCFR Title 7 Volume 6
no calcs
no extra credit
Design Submittal |
|
|
Term
|
Definition
Development Density and Community Connectivity
1 Point
No standards
No Extra credit -
Design Submittal |
|
|
Term
|
Definition
Brownfield Redevelopment
1 point
ASTM E1903-97 Phase II Environmental Site Assessment EPA
Brownfields Definition
no calcs
no extra credit
Design Submittal |
|
|
Term
|
Definition
Alternative Transportation
Public Transportation Access
1 point
no standards
Extra credit for
Comprehensive Transportation Management Plan Design Submittal |
|
|
Term
|
Definition
Alternative Transportation
Bicycle Storage and Changing Rooms
1 Point
no standards
One point for Comprehensive Transportation Management Plan
Design Submittal |
|
|
Term
SS Total Possible Points? |
|
Definition
|
|
Term
SS How many Prereq's? How Many Credits? |
|
Definition
1 Prereq
8 Credits with subcredits
4.1, 4.2, 4.3, 4.4
5.1, 5.2
6.1, 6.2
7.1, 7.2 |
|
|
Term
|
Definition
Alternative Transportation
Low Emission and Fuel Efficient Vehicles
1 Point
Extra point for Comprehensive Transporation Mgmt Plan
no standards
Design Submittal |
|
|
Term
|
Definition
Alternative Transportation
Parking Capacity
1 point
Portland Oregon Zoning Code: Title 33, Chapter 33.266
Institute of Transportation Engineers' Parking Generation, 3rd Edition
Extra Credit for Comprehensive Transportation Management Plan
Design Submittal |
|
|
Term
|
Definition
Site Development
Protect or Restore Habitat
1 Point
no standard
One point for restoring/protecting 75% of site excluding building footprint
Construction Submittal |
|
|
Term
|
Definition
Site Development
Maximize Open Space
1 Point
Extra Point for doubling open space reqd - 50%; for no zoning reqts open space = 2x building footprint; urban areas = 40% of site area
Design Submittal |
|
|
Term
|
Definition
Stormwater Design
Quantity Control
1 Point
no standards
no extra credit
Design Submittal |
|
|
Term
|
Definition
Stormwater Design
Quality Control
1 Point
Guidance Specifying Management Measures for Sources of Non-Point Pollution in Coastal Waters
No extra credit
Design Submittal |
|
|
Term
|
Definition
Heat Island Effect Non Roof
1 point
no standards
Extra Credit for 100% of non-roof impervious surfaces have been constructed with high albedo materials or open grid or will be shaded in 5 years or 100% of parking are covered
Construction Submittal |
|
|
Term
|
Definition
Heat Island Effect Roof
ASTM E1908-01
ASTM-E408-71
ASTM E903-96
ASTM E1918-97
ASTM C1371-04
ASTM C1579-04
Extra credit for 100% green roof
Design Submittal |
|
|
Term
|
Definition
Light Pollution Reduction
1 point
ASHRAE 90.1-2004 Section 9 describes the reqts for lighting of buildings
no extra credit Design Submittal |
|
|