Term

What is the intent of SS Credit 7.1: Heat Island Effect: Non-Roof? 

Definition
 

Reduce heat islands (thermal gradient differences between developed and undeveloped areas) to minimize impact on microclimate and human and wildlife habitat.


Term
 

What is the intent of SS Prerequisite 1: Construction Activity and Pollution Prevention? 


Definition
 

Reduce pollution from construction activities by controlling:

  1. soil erosion
  2. waterway sedimentation
  3. airborne dust generation
Term

What is the intent of SS Credit 4.1: Alternative Transportation: Public Transportation Access? 

Definition

Reduce pollution and land development impacts from automobile use.

Term
 

What is the intent of SS Credit 3: Brownfield Redevelopment?  

Definition

Rehabilitate damaged sites where development is complicated by environmental contamination, reducing pressure on undeveloped land.

Term
[image]

What is the intent of SS Credit 5.2: Site Development: Maximize Open Space? 

Definition

Provide a high ratio of open space to development footprint to promote biodiversity.

Term

What is the intent of SS Credit 2: Development Density & Community Connectivity? 

Definition

Channel development to urban areas with existing infrastructure, protect greenfields and preserve habitat and natural resources.

Term
[image]

What is the intent of SS Credit 7.2: Heat Island Effect: Roof? 

Definition
[image]

Reduce heat islands (thermal gradient differences between developed and undeveloped areas) to minimize impact on microclimate and human and wildlife habitat.

Term

What is the intent of SS Credit 4.3: Alternative Transportation: Low Emitting & Fuel Efficient Vehicles? 

Definition

Reduce pollution and land development impacts from automobile use.

Term

What is the intent of SS Credit 4.2: Alternative Transportation: Bicycle Storage & Changing Rooms? 

Definition

Reduce pollution and land development impacts from automobile use.

Term

What is the intent of SS Credit 6.1: Stormwater Design: Quantity Control? 

Definition
 

Limit disruption of natural hydrology by:

  1.  reducing impervious cover
  2. increasing on-site infiltration
  3. managing stormwater runoff
Term

What is the intent of SS Credit 6.2: Stormwater Design: Quality Control? 

Definition
 

Reduce or eliminate water pollution by reducing

 

  1. impervious cover
  2. increasing on-site infiltration
  3. eliminating sources of contaminants
  4. removing pollutants for stormwater runoff
Term
 

What is the intent of SS Credit 1: Site Selection? 


Definition
 

Avoid development of inappropriate sites and reduce the environmental impact from the location of a building on a site.


Term

What is the intent of SS Credit 8: Light Pollution Reduction? 

Definition

Minimize light trespass from the building and site, reduce sky-glow to increase night sky access, improve nighttime visibility through glare reduction, and reduce development impact on nocturnal environments.

Term

What is the intent of SS Credit 4.4: Alternative Transportation: Parking Capacity? 

Definition

Reduce pollution and land development impacts from single occupancy vehicle use.

Term

What is the intent of SS Credit 5.1: Site Development: Protect or Restore Habitat? 

Definition

Conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity.

Term
What is SSc7.1 called?
Definition
Heat Island Effect, Non-Roof
Term
What is SSc4.3 called?
Definition
Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
Term
What is SSc6.2 called?
Definition
Stormwater Design, Quality Control
Term
What is SSp1?
Definition

Construction Activity Pollution Prevention

Term
What is SSc4.4 called?
Definition
Alternative Transportation, Parking Capacity
Term
What is SSc8 called?
Definition
Light Pollution Reduction
Term
What is SSc5.1 called?
Definition
Site Development, Protect or Restore Habitat
Term
What is SSc2 called?
Definition
Development Density & Community Connectivity
Term
What is SSc1 called?
Definition
Site Selection
Term
What is SSc6.1 called?
Definition
Stormwater Design, Quantity Control
Term
What is SSc3 called?
Definition
Brownfield Redevelopment
Term
What is SSc4.2 called?
Definition
Alternative Transportation, Bicycle Storage & Changing Rooms
Term
What is SSc7.2 called?
Definition
Heat Island Effect, Roof
Term
What is SSc4.1 called?
Definition
Alternative Transportation, Public Transportation Access
Term
What is SSc5.2 called?
Definition
Site Development, Maximize Open Space
Term

What is required for (SSc4.3) Credit 4.3:Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
Option 2?

Definition

Provide preferred parking for Low-Emitting/Fuel Efficient vehicles for 5% of the total vehicle parking capacity of the site.

Term
 

What is required for SSc4.3 Option 1?


Definition
 [image]
[image]

Provide Low-Emitting/Fuel Efficient vehicles and preferred parking for 3% of Full-Time Equivalent (FTE) occupants

 

AND

 

provide preferred parking for these vehicles.

Term

List a potential strategy for (SSc5.1) Credit 5.1:Site Development, Protect or Restore Habitat
& (SSc5.2) Credit 5.2:Site Development, Maximize Open Space.

Definition
  1. stacking the building program
  2. tuck-under parking 
  3. sharing the facilities with neighbors
Term

How many options are there for (SSc4.3) Credit 4.3:Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles?

Definition

3

Term

What is required for (SSc7.2) Credit 7.2:Heat Island Effect, Roof option 3 - Combined Reflective Roof and Green Roof Systems?

Definition
 

Install high Albedo and vegetated roof surfaces that, in combination, meet the following criteria:

 

(Area of SRI Roof / 0.75) + (Area of vegetated roof / 0.5) >= Total Roof Area

Term
[image]

How many options are there for (SSc5.2) Credit 5.2:Site Development, Maximize Open Space?

Definition
[image]3
Term

What is required for (SSc4.4) Credit 4.4:Alternative Transportation, Parking Capacity
Option 4 - All?

Definition

Provide no new parking.

Term

What is required for (SSc4.1) Credit 4.1:Alternative Transportation, Public Transportation Access
Option 2 - Bus Service?

Definition

Locate project within 1/4 mile of one or more stops for two or more public campus bus lines usable by building occupants

Term

For projects located in urban areas that earn (SSc2) Credit 2:Development Density & Community Connectivity, vegetated roof areas can...

Definition
 

contribute to credit compliance under (SSc5.2) Credit 5.2:Site Development, Maximize Open Space.

Term

What is required for (SSc6.2) Credit 6.2:Stormwater Design, Quality Control?

Definition
 

Implement a stormwater management plan that

 

reduces impervious cover,

promotes infiltration, and

captures and treats the stormwater runoff from

 

90% of the average annual rainfall using acceptable best management practices (BMPs).

 

(80% of the average annuual post-development Total Suspended Solids (TSS) is removed.)

Term
 

What is a potential strategy for SSc2?


Definition

During the site selection process, give preference to urban sites with pedestrian access to a variety of services.

Term

What is required for (SSc5.2) Credit 5.2:Site Development, Maximize Open Space
Option 1 - Exceed local open space zoning requirements

Definition
 

Reduce the development footprint and/or

 

provide vegetated open space within the project boundary to exceed the local zoning's open space requirement for the site by 25%

Term

What is sedimentation?

Definition

Sedimentation is the addition of soils to water bodies by natural and human related activities.  Sedimentation decreases water quality and accelerates the aging process of lakes, rivers and streams.

Term
[image]

A potential strategy for (SSc7.2) Credit 7.:Heat Island Effect, non Roof
could be…

Definition
 

Replace constructed surfaces (i.e. roof, roads, sidewalks, etc.) with vegetated surfaces such as

 

vegetated roofs and open grid paving or

 

specify high-Albedo materials to reduce the heat absorption.

Term

What is required for SSc6.1 option 2- Existing Imperviousness Greater Than 50%?

Definition

Implement a stormwater management plan that results in a 25% decrease in the volume of stormwater runoff from the two-year, 24 hour design storm

Term
[image]

The ESC plan shall describe the measures implemented to accomplish the following objectives:

Definition
 
  1. Prevent loss of soil during construction by stormwater runoff and/or wind erosion.
  2. Prevent sedimentation of storm sewer or receiving streams.
  3. Prevent polluting the air with dust and particulate matter.
Term
 

How many options are there for Interior Lighting under (SSc8) Credit 8:Light Pollution Reduction?

Definition
 

2

  1. The project lighting is designed so that the angle of maximum candela from each interior luminaire intersects opaque interior surfaces and does not exit through windows.
  2. Automatic lighting controls have been installed to turn off non-essential interior lighting during non-business hours.
Term

How many options are there for (SSc7.2) Credit 7.2:Heat Island Effect, Roof?

Definition
3
Term

What ASTM standard can be used for SSc3?

Definition
 

ASTM E1903-97 Phase II Environmental Site Assessment

Term

The slope of a Low-Sloped Roof is…

Definition
 

less than or equal to 2:12

Term

Define Previously Developed Site.

Definition

Previously Developed Sites are those that previously contained buildings, roadways, parking lots, or were graded or altered by direct human activities.

Term
 

The slope of a Steep-Sloped Roof is…

Definition
 

greater than 2:12

Term

How many options are there for (SSc4.2) Credit 4.2:Alternative Transportation, Bicycle Storage & Changing Rooms?

Definition
 

2

  1. Option 1 (Commercial or institutional) - Provide secure bicycle racks and/or storage (withing 200 yards of a building entrance) for 5 % or more of all building users (measured at peak periods) AND provide shower and changing facilities in the building, or within 200 yards of a building entrance, for 0.5% of Full-Time Equivalent (FTE) occupants.
  2. Option 2 - (Residential) - Provide covered storage facilities for securing bicycles for 15% or more of building occupants in lieu of changing/shower facilities.

Term

What is erosion?

Definition

Erosion is a combination of processes in which materials of the earth's surface are loosened, dissolved or worn away and transported from one place to another by natural agents (water, wind, or gravity).

Term

The ESC Plan shall conform to the erosion and sedimentation requirements of what?

Definition
 
  • 2003 EPA Construction General Permit

OR

  • local erosion and sedimentation control standards and codes,

 whichever is more stringent.


Term
 

What is required for (SSc5.1) Credit 5.1:Site Development, Protect or Restore Habitat
Option 2 - Previously Developed or Graded Sites?

Definition
 

Restore or protect a minimum of 50% of the site area with native or adapted vegetation.

Term

SSc1 - Site Selection states do not develop on any of the following 6 sites.

Definition
  1. Prime farmland
  2. Previously undeveloped land whose elevation is lower than 5 feet above the elevation of the 100-year flood line as defined by FEMA
  3. Land identified as habitat for any species on threatened or endangered lists
  4. Within 100 feet of any wetlands OR within setback distances from wetlands prescribed in state or local regulations
  5. Undeveloped land within 50 feet of water body, defined as seas, lakes, rivers, streams and tributaries wich support or could support fish, recreation or industrial use, consisten with the terminology of the Clean Water Act 
  6. Land which prior to acquistion was public parkland, unless land of equal or greater value as parkland is accepted in trade by the public landowner
Term
[image]

SSc2 - What are the requirements of Option 2 - Community Connectivity?


Definition
 

Construct or renovate building on a previously developed site

AND

within 1/2 mile of a residential zone or neighborhood with an average density of 10 units per acre net

AND

within ½ mile of at least 10 Basic Services

AND

with pedestrian access between the building and the services.

Term
 

What is required for (SSc4.4) Credit 4.4:Alternative Transportation, Parking Capacity Option 2 - Non-Residential?

 

This is for projects that provide parking for less than 5% of FTE occupancy?

Definition
[image]

Provide preferred parking for carpools or vanpools, marked as such, for 5% of total provided parking spaces.

Term
 

For (SSc6.2) Credit 6.2:Stormwater Design, Quality Control, what are potential strategies for managing stormwater flows?

Definition
 

Specify

  • vegetated roofs,
  • pervious paving,
  • and other measures to minimize impervious surfaces.

Reuse stormwater volumes generated for non-potable uses such as

  • landscape irrigation,
  • toilet and urinal flushing and
  • custodial uses.
Term
 

What is required for (SSc4.2) Credit 4.2:Alternative Transportation, Bicycle Storage & Changing Rooms
Option 2 - Residential Building? Provide covered bicycle storage for...

Definition
 

15% or more of building occupants

Term
[image]

How many options are there for (SSp1) Prereq 1:Construction Activity Pollution Prevention?

Definition
 

2

 

  1. The Erosion and Sedimentation Control plan  conforms to the 2003 EPA Construction General Permit, which outlines the provisions necessary to comply with Phase II of the National Pollutant Discharge Elimination System (NPDES) program.-OR-
  2. The Erosion and Sedimentation Control plan follows local erosion and sedimentation control standards, which are more stringent than the NPDES program requirements.
Term

What is required for interior lighting systems for (SSc8) Credit 8:Light Pollution Reduction?



[image]
Definition
 

The angle of maximum candela from each interior luminaire as located in the building shall intersect opaque building interior surfaces and not exit out through the windows.

 

OR 

 

All non-emergency interior lighting shall be automatically controlled to turn off during non-business hours. Provide manual override capability for after hours use.

Term
 [image]
[image]

How many Prerequisites are there for the Sustainable Sites LEED Category?


Definition
1
Term

How many options are there for SS Credit 2: Development Density & Community Connectivity?

Definition
 

2

Option 1 - Development Density

Option 2 - Community Connectivity

Term
 

How many options are there for SSc4.1?

Definition
 [image]
[image]

2

  1. Locate project within 1/2 mile of an existing (or planned and funded) commuter rail, light rail or subway station.  OR
  2. Locate project within 1/4 mile of one or more stops for two or more public campus bus lines usable by building occupants

Term
 

What is an ESC Plan?

Definition
 

Erosion and Sedimentation Control Plan detailed in SSp1 - Construction Activity Pollution Prevention

Term
 

How much time is allowed for shade to develop in (SSc7.1) Credit 7.1:Heat Island Effect, Non-Roof
option 1?

Definition
 

5 years

Term

Define a Threatened Species.



[image]
Definition
 

A Threatened Species is an animal or plant species that is likely to become endangered within the foreseeable future.

Term

How many options are there for (SSc7.1) Credit 7.1:Heat Island Effect, Non-Roof?

Definition
2
Term

How many options are there for (SSc5.1) Credit 5.1:Site Development, Protect or Restore Habitat?

Definition
2
Term

What is required for SSc5.2 Option 3 - Where a zoning ordinance exists, but there is no requirement for open space (zero)?

Definition

Provide vegetated open space equal to 20% of the project’s site area.

Term

What is required for SSc5.2 Option 2 - Areas with no local zoning requirements?

Definition

Provide vegetated open space area adjacent to the building that is equal to the building footprint.

Term

What is required for (SSc5.1) Credit 5.1:Site Development, Protect or Restore Habitat
Option 1 - Undisturbed Greenfield Sites?

Definition
 

Limit site disturbance to

40 ft beyond building perimeter,

10 ft beyond surface walkways,

15 ft beyond primary roadway curbs, and main utility branch trenches 

25 ft beyond constructed areas with permeable surfaces that require additional staging areas in order to limit compaction in the constructed area

Term

A potential strategy for SSc7.2 could be..

Definition

Install a high-Albedo and vegetated roof to reduce heat absorption.

Term

Define Endangered Species.

Definition

An Endangered Species is an animal or plant species that is in danger of becoming extinct hroughout all or a significant portion of its range due to harmful human activities or environmental factors.

Term
 

What is required for (SSc7.1) Credit 7.1:Heat Island Effect, Non-Roof- option 1- Reflective Paving, Shading, and/or Open Grid Pavement?

Definition
 

Provide any combination of the following strategies for 50% of the site hardscape (including roads, sidewalks, courtyards and parking lots):

  • Shade (within 5 years of occupancy);
  • Paving materials with a Solar Reflectance Index (SRI)2 of at least 29;
  • Open grid pavement system
Term

How many LEED points are possible for Sustainable Sites?

Definition
14
Term

What is required for Exterior Lighting for (SSc8) Credit 8:Light Pollution Reduction?

Definition
 [image]
[image]

Only light areas as required for safety and comfort. Do not exceed

 

  • 80% of the lighting power densities for exterior areas and 
  • 50% for building facades and landscape features

as defined in ASHRAE/IESNA Standard 90.1-2004, Exterior Lighting Section, without amendments.

Term
 

What is required for (SSc4.4) Credit 4.4:Alternative Transportation, Parking Capacity
Option 1 - Non-Residential with new parking ?

Definition
 

Size parking capacity to meet, but not exceed minimum local zoning requirements,

AND,

provide preferred parking for carpools or vanpools for 5% of the total provided parking spaces.

Term
 

How many options are there for (SSc4.4) Credit 4.4:Alternative Transportation, Parking Capacity?

Definition
4
Term

What is a potential strategy for (SSc4.1) Credit 4.1:Alternative Transportation, Public Transportation Access?

Definition
 

Perform a transportation survey of future building occupants to identify transportation needs.

 

Site the building near mass transit.

Term
List at least 5 goals for Sustainable Sites.
Definition
 [image]
[image]
  1. Develop only appropriate sites
  2. Reuse existing buildings and/or sites
  3. Protect natural and agricultural sites
  4. Reduce need for automobile use
  5. Protect and/or restore natural sites
Term
How many points are available for Site Development?
Definition
2, 1 each for 5.1 & 5.2
Term
 

How many options are there for (SSc6.2) Credit 6.2:Stormwater Design, Quality Control?

Definition
1
Term
 

What is required for SSc6.1 option 1- Existing Imperviousness Less Than or Equal to 50%?

Definition
 

Implement a stormwater management plan that prevents the post-development peak discharge rate and quantity from exceeding the pre-development peak discharge rate and quantity for the 1 and 2 year, 24 hour design storms

OR

Implement a stormwater management plan that protects receiving stream channels from excessive erosion by implementing a stream channel protection strategy and quantity control strategies

Term

What is required for (SSc7.1) Credit 7.1:Heat Island Effect, Non-Roof option 2- Covered Parking?

Definition
 

Place a minimum of 50% of parking spaces under cover (defined as under ground, under deck, under roof, or under a building).

 

Any roof used to shade or cover parking must have an SRI of at least 29.

Term

List 4 structural control technologies for controlling Erosion and Sedimentation.

Definition
  1. Earth Dike
  2. Silt Fence
  3. Sediment Trap
  4. Sediment Basin
Term
 

What is required for (SSp1) Prereq 1:Construction Activity Pollution Prevention?

Definition

Create and implement an Erosion and Sedimentation Control Plan for all construction activities associated with the project.

Term
 

For SSc2: Development Density & Community Connectivity, how is proximity to basic services determined?  

Definition
 

Proximity is determined by drawing a 1/2 mile radius around the main building entrance on a site map and counting the services within that radius.

Term
 

What is a potential strategy for SSc1: Site Selection?

Definition
 

Select a suitable building location and design the building with the minimal footprint to minimize site disruption of those environmentally sensitive areas as defined in the requirements

Term
 

What is required for (SSc4.4) Credit 4.4:Alternative Transportation, Parking Capacity
Option 3 - Residential?

Definition
 [image]
[image]

Size parking capacity to not exceed minimum local zoning requirements,

AND,

provide infrastructure and support programs to facilitate shared vehicle usage such as carpool drop-off areas, designated parking for vanpools, or car-share services, ride boards, and shuttle services to mass transit.

Term
 

What is a potential strategy for (SSc5.1) Credit 5.1:Site Development, Protect or Restore Habitat & (SSc5.2) Credit 5.2:Site Development, Maximize Open Space?

Definition
 

Perform a site survey to identify site elements and adopt a master plan for development of the project site.

Term
 

What agencies can classify a site as a Brownfield?

Definition
 

local, state or federal regulatory agency

Term
 

How many options are there for (SSc6.1) Credit 6.1:Stormwater Design, Quantity Control?

Definition
2
Term
How many points are available for Stormwater Design?
Definition
"2, 1 each for 6.1 & 6.2"
Term
 

List 3 stabilization technologies for controlling Erosion and Sedimentation.

Definition
  1. Temporary Seeding
  2. Permanent Seeding
  3. Mulching
Term
 

How many Credits are in the Sustainable Sites LEED Category?

Definition
8
Term

Define Wetland Vegetation.

Definition

Wetland Vegetation consists of plants that require saturated soils to survive, as well as certain tree and other plant species that can tolerate prolonged wet soil conditions.

Term
 

What is required for (SSc4.1) Credit 4.1:Alternative Transportation, Public Transportation Access
 Option 1- Commuter Rail Service?

Definition
 

Locate project within 1/2 mile of existing (or planned and funded) commuter rail, light rail or subway station

Term
 

What is Preferred Parking?

Definition
 

Parking spots that are closest to the main entrance of the project(exclusive of spaces designated for handicapped)

 

or

 

parking passes provided at a discounted price.

Term

What is required for SSc3:Brownfield Redevelopment?

Definition
 

Develop on a site documented as contaminated (by means of ASTM E1903-97 phase ll Environmental Site Assessment or a local Voluntary Cleanup Program)

 

OR

 

on a site classified as a Brownfield by a local, state or federal government agency.

Term
 

What is required for (SSc7.2) Credit 7.2:Heat Island Effect, Roof option 1 - Reflective Roofing Materials?


[image]
Definition
 [image]
[image]

Use roofing materials having a Solar Reflectance Index (SRI)

 

equal to or greater than 29 for a steep sloped roof and

greater than 78 for a low sloped roof for a minimum of 75% of the roof surface

Term

List the 4 Referenced Standards used for SSc1 - Site Selection

Definition
  1. U.S. Dept of Agricultural Definition of Prime Agriculture  Land as stated in U.S code of federal regulations 7CFR657.5
  2. Federal Emergency Management (FEMA) 100 year flood definition
  3. Endangered Species Lists (U.S. Fish & Wildlife Service List of Threatened & Endangered Species; National Marine Fisheries Service List of Endangered Marine Species
  4. Definition of Wetlands in the US code of federal regulations ( 40 CFR, Parts 23-233, 22)
Term
 

What is the requirements of SSc2 Option 1- Development Density

Definition
Construct or renovate building on a previously developed site

AND

in a community with a minimum density of 60,000 square feet per acre net.


Term
 

What is required for (SSc7.2) Credit 7.2:Heat Island Effect, Roof
option 2 - Green Roof?

Definition
 

Install a vegetated roof for at least 50% of the roof area.

Term

What is a potential strategy for (SSp1) Prereq 1:Construction Activity Pollution Prevention?

Definition
 

Employ strategies such as temporary and permanent seeding, mulching, earth dikes, silt fencing, sediment traps and sediment basins.

Term
 

SSc2: Development Density or Community Connectivity - List 10 Basic Services.

Definition
  1. bank
  2. church
  3. grocery story
  4. daycare
  5. museum
  6. laundry
  7. beauty
  8. hardware
  9. library
  10. senior care
  11. school
  12. pharmacy
  13. post office
  14. restaurant
  15. theatre
Term

What is required for (SSc4.3) Credit 4.3:Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
Option 3?

Definition

Install refueling stations for 3% of the total vehicle parking capacity of the site.