Construction site erosion factors (4): |
|
Definition
-rainfall energy -soil erodibility -site topography -surface cover |
|
|
Term
NEPA mandates that all federal agencies must complete a(n) ______ or ______ on their activities. |
|
Definition
environmental assessment / environmental impact statement |
|
|
Term
CWA (1972) classifies sediment releases as ________. |
|
Definition
|
|
Term
Construction activities must comply with state regulations and programs addressing ________. |
|
Definition
non-point source pollution |
|
|
Term
In the CWA, Federal Enforcement is Section ___ and NPDES is Section ___. |
|
Definition
Federal Enforcement: 309 NPDES: 402 |
|
|
Term
MS4 stands for _____________. |
|
Definition
Municipal Separate Stormwater Sewer System |
|
|
Term
A notice of intent (NoI) includes (4): |
|
Definition
-BMPs -measurable goals -implementation schedule -responsible persons |
|
|
Term
Non-numeric limitations of the ELG apply to sites greater than or equal to _____. |
|
Definition
|
|
Term
Principles of NPDES qualifying programs (5): |
|
Definition
1. good site planning 2. minimize soil movement 3. capture sediment 4. good housekeeping 5. mitigation of post-construction SW discharges |
|
|
Term
State NPDES programs include (4): |
|
Definition
-SWPPPs -inspections by site operators -E&SC -post-construction soil stabilization |
|
|
Term
General requirements for Construction General Permits (3): |
|
Definition
|
|
Term
|
Definition
-potential SW pollution sources -lists and describes E&S controls -operator procedures for CGP compliance |
|
|
Term
Design objectives of SWPPP (7): |
|
Definition
-stablilize site ASAP - protect channels & slopes -reduce impervious surfaces -control site perimeter -protect receiving waters -follow PP measures -minimize duration & area of exposed soils |
|
|
Term
ADEM qualifying storm (inches): |
|
Definition
|
|
Term
ADEM water quality based effluent limitations: less than ____ below background |
|
Definition
|
|
Term
ADEM maintenance requirements for major repairs (days): |
|
Definition
|
|
Term
Additional protections applies within ____ feet of a surface water. |
|
Definition
|
|
Term
E/S control design requirements are for a __yr,__hr storm event |
|
Definition
|
|
Term
If within 50ft of a surface water, must provide a natural buffer; otherwise achieve an equivalent ____________. |
|
Definition
|
|
Term
For perimeter controls, sediment must be removed prior to ____ of the above ground height. |
|
Definition
|
|
Term
ADEM stabilization requirements after earth-disturbing activities cease (days): |
|
Definition
|
|
Term
ADEM vegetative cover density: EPA vegetative cover density: |
|
Definition
|
|
Term
Sites discharging into Tier 2/2.5/3 waters must stabilize soils within __ days. |
|
Definition
|
|
Term
Sediment basins must be able to store for a _______ storm event. |
|
Definition
|
|
Term
Site inspections must be once a month or after a qualifying event of ___ inches. |
|
Definition
|
|
Term
If substantial work is needed, ADEM requires work completed in _ days. |
|
Definition
|
|
Term
SWPPP modification and corrective action must take place in _ days. |
|
Definition
|
|
Term
NOT is submitted after (3): |
|
Definition
-all earth disturbing activities completed -uniform perennial veg. cover established -permanent stabilization measures used |
|
|
Term
Groups who use SWPPPs (4): |
|
Definition
-owner -designer -subcontractors -inspectors |
|
|
Term
Records must be retained for ___ years from the termination date. |
|
Definition
|
|
Term
Before starting work (3): |
|
Definition
- submit NOI - obtain NPDES permit - make a SWPPP |
|
|
Term
Hydrological cycle components (5) |
|
Definition
-precipitation -infiltration -runoff -evaporation/transpiration -GW & stream flow |
|
|
Term
Typical USGS topo map scale is _:_____ |
|
Definition
|
|
Term
Two main factors affecting peak rate of runoff: |
|
Definition
- duration & intensity of a storm |
|
|
Term
Storms are described by IDF curves, which stands for: |
|
Definition
intensity, duration, & frequency |
|
|
Term
Time of concentration (Tc) is time for runoff to travel to a pt of interest from _______. |
|
Definition
the hydraulically most distant point |
|
|
Term
When channels are straightened, Tc ______. |
|
Definition
|
|
Term
When overland flow is diverted, Tc ______. |
|
Definition
|
|
Term
Design storm duration must equal ___. |
|
Definition
|
|
Term
50% of annual erosion potential in Alabama ranges from __ to __ (inches). |
|
Definition
|
|
Term
What size storm events are used in E&SC plans? |
|
Definition
|
|
Term
Rainfall Distribution Type for most of Alabama (Roman Numeral): |
|
Definition
|
|
Term
Two types of reaches (WinTR-55): |
|
Definition
|
|
Term
Rills are generally less than __ inches deep. |
|
Definition
|
|
Term
Different erosion types (6): |
|
Definition
-splash -sheet flow -rill -gully -stream banks -shoreline |
|
|
Term
The most important rain parameter in erosion is: |
|
Definition
|
|
Term
The most important soil parameter in erosion is: |
|
Definition
|
|
Term
The RUSLE equation can be used to predict rill erosion, but not _________. |
|
Definition
|
|
Term
K factor is dependent upon (3): |
|
Definition
texture, structure, & permeability |
|
|
Term
Erosion rate is directly proportional to _____&_____ of cover. |
|
Definition
|
|