Term
EQ 3.1 Construction IAQ Management Plan: During Construction |
|
Definition
Develop an IAQ management plan, meet SMACNA guidelines and air handler should have a MERV of at least 8 " 5 Design Approaches" PTS-1 |
|
|
Term
Develop and implement an IAQ ________ for the construction and pre-occupancy phases of the tenant space. |
|
Definition
|
|
Term
During construction meet or exceed the recommended Design Approaches of the ___________________ IAQ Guidelines for Occupied Buildings Under Construction, 1995, Chapter 3. |
|
Definition
Aheet Metal and Air Condidtioning Contractors' National Association (SMACNA) |
|
|
Term
Protect stored on-site and installed absorptive materials from_________ |
|
Definition
|
|
Term
If ir hndler must be used during construction, filtration media with a Minimum Efficiency Reporting Value (MERV) of _____ must be used at each return air grill |
|
Definition
|
|
Term
Provide ____ photgraphs, six photographs taken on three different occassions during construction- along with identification of the SMACNA approach featured by each photograph, in order to show consitent adherence to the credit requirements |
|
Definition
|
|
Term
OR// Declare the __________ of SMACNA IAQ Guideline for Occupied Buildings under Contrucion, 1995, Chapter 3, which were used during building construction, Include a brief listing of some of the mportant design approaches employed. |
|
Definition
|
|
Term
|
Definition
HVAC Protection Source Control Pathway Interruption Housekeeping Scheduling
|
|
|
Term
|
Definition
Protect all HVAC equipment from both dust and odors. |
|
|
Term
|
Definition
Specify finish materials such as paints, carpet, composit wood, adhesives and sealants that have low toxicity levels, or none at all. |
|
|
Term
|
Definition
During Construction, isolate areas of work to prevent contamination of clean or occupied spaces. |
|
|
Term
|
Definition
Institute cleaning activities designed to control contaminants in building spaces during construction and prior to occupancy. |
|
|
Term
|
Definition
Coordinate construction activies to minimize or eliminate disruption of operations in the occupied portions of the building |
|
|