Term
how many active and spare transducers for primary and failsafe |
|
Definition
Primary: 2 active 1 spare Failsafe: 1 active and 2 spare |
|
|
Term
|
Definition
|
|
Term
|
Definition
Hydraulic Storage Component |
|
|
Term
4 slippers on top of cross head are for what |
|
Definition
|
|
Term
the baffle system in SWC is what kind |
|
Definition
|
|
Term
Pressure for 2 MEC transducers Pressure for 1 Accum transducers |
|
Definition
|
|
Term
|
Definition
9 3 Pri 3 Failsafe 2 MEC 1 Accumulator |
|
|
Term
|
Definition
|
|
Term
What to do if there is no salt water flow |
|
Definition
turn on salt water main valve |
|
|
Term
what type of filter is cuno |
|
Definition
|
|
Term
|
Definition
Anchors going back into Battery |
|
|
Term
2 things needed for tranferring |
|
Definition
|
|
Term
8 steps for transferring in |
|
Definition
1)stowage tank at 90-110 PSI 2)engine at 50 PSI 3) block retract valve open 4) open bypass valve 5) 2 pos 4 way valve open 6) open stowage tank engine valve 7) open needle valve 8) open high points |
|
|
Term
|
Definition
1) strip wire 2) double isolate 3) blow down to 150 4) 0 PSI 5) mark stowage tank level 6) open stowage tank valve to an engine 7) open 2 pos 4 way valve 8) block open retract valve 9) open bypass valve 10) open needle valve 11) open nozzle end air |
|
|
Term
|
Definition
|
|
Term
R-6 below deck terminal are done when |
|
Definition
300 first then every 600 traps |
|
|
Term
R-5 terminals are done when |
|
Definition
|
|
Term
R-15 cdp swaps are done when |
|
Definition
|
|
Term
r- 20 M zinc anodes are done when |
|
Definition
monthly out at sea and prior to underway |
|
|
Term
R-7 fluid filters are done when |
|
Definition
|
|
Term
R-14 anchor slippers are done when |
|
Definition
|
|
Term
when is R-10 crosshead slippers done |
|
Definition
|
|
Term
|
Definition
|
|
Term
R-1 engine sheaves are done when |
|
Definition
|
|
Term
|
Definition
1 inch combo, ruler, 3/4 combo 3/8 combo special tool 9/16 combo 1/2 inch speed handle |
|
|
Term
LVDT and what does it tell you |
|
Definition
Linear Variable Differential Transformer tells you position of stem |
|
|
Term
|
Definition
|
|
Term
to trouble shoot during flight ops what needs to be offline |
|
Definition
maintenance mode and cdp is offline |
|
|
Term
what needs to be done during exercises |
|
Definition
stroke anchors, sheave dampers and engine |
|
|
Term
what kind of pull for wire pull- long pull or short pull |
|
Definition
|
|
Term
how many pulls for a function |
|
Definition
|
|
Term
function anchors pulls which side |
|
Definition
|
|
Term
stroke anchors pulls which side |
|
Definition
|
|
Term
how far is set screw backed out |
|
Definition
|
|
Term
anchor terminals are how long |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
stem not seated retract valve is open |
|
|
Term
3 Retract Control Valve sensors are wat |
|
Definition
|
|
Term
|
Definition
|
|
Term
High speed sheave size is what |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
15-20 seconds ideal : 17 sec |
|
|
Term
|
Definition
|
|
Term
how many primary actuators and failsafes |
|
Definition
1 primary and 2 failsafes |
|
|
Term
how long is purchase cable good for |
|
Definition
15 months or 2000 arrestments |
|
|
Term
|
Definition
prevents stem from slamming into sleeve and chattering |
|
|
Term
counter balance chamber does what |
|
Definition
equalizes pressure above and below stem to keep it seated |
|
|
Term
|
Definition
every 300 to 900 traps then every 1000 to rereeve |
|
|
Term
|
Definition
|
|
Term
|
Definition
advanced recovery control |
|
|
Term
what do you use when there is no hydraulic fluid |
|
Definition
|
|
Term
Primary and failsafe pressure |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
2 heavy hit aircraft and their weights |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
seal for Battery Indicator rod |
|
|
Term
temp stowage tank relieve valve relieves at what |
|
Definition
|
|
Term
Clogged cartridge does this |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
what do you want to break first- cdp or cable |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
engine is designed for this |
|
Definition
maximum stability with least amount of weight |
|
|
Term
|
Definition
|
|
Term
|
Definition
accumulator to fluid cooler to fluid filter to retract valve to sleeve to MEC |
|
|
Term
fluid flow upon arrestment |
|
Definition
Crosshead pushes ram into MEC MEC pushes fluid through 5 inch sleeve at 10K PSI out through outlet elbow thru accumulator also out 5 inch sleeve to operating end of anchors |
|
|
Term
Degrade mode 1 is what Degrade mode 2 is what degrade mode 3 is what |
|
Definition
Primary Engine GUI and Manual |
|
|
Term
Alt Bus Master is which degrade mode Engines set themselves is what |
|
Definition
Alt Bus is 1 Engine Gui is 2 |
|
|
Term
can you force ready a serious fault how with who's approval |
|
Definition
yes 1) Air Boss and Below Deck |
|
|
Term
can you recover with critical fault name all 7 crit faults |
|
Definition
|
|
Term
how many distro blocks and relieves at what pressure |
|
Definition
7 Master- 3000 2 Primary; 2000 4 Secondary- 1800 |
|
|
Term
|
Definition
|
|
Term
how many lube shots per second |
|
Definition
|
|
Term
|
Definition
|
|
Term
lube drum contains how many lbs and how many shots |
|
Definition
|
|
Term
force battery color force fault color |
|
Definition
Battery: dim yellow fault dim red |
|
|
Term
how many slippers on anchors lower/ higher |
|
Definition
|
|
Term
how many slippers on floating piston fluid/air |
|
Definition
|
|
Term
|
Definition
|
|
Term
slippers on Crosshead how many on top |
|
Definition
|
|
Term
these are held in by brass pins from retainer plate |
|
Definition
|
|
Term
flapper valves in anchors |
|
Definition
|
|
Term
service stroke of anchors |
|
Definition
|
|
Term
|
Definition
|
|
Term
pressure equalizing valves starts this |
|
Definition
initial movement of operating pressure |
|
|
Term
|
Definition
cable tension overcomes hydraulic pressure |
|
|
Term
|
Definition
hydraulic pressure overcomes cable tension |
|
|
Term
|
Definition
1) vent 2) start service X> arrest control> take control > OP mode > maint mode > Main Button > crov wire pull > start service X
3. close inlet valve 4. Deckedge says: "alright ening, stb side, portside stand clear, about to long pull and swap everyone says clear 5. movement and then roger movement Deckedge says breaking off and swapping 7. stop service X 8. reset cdp > eng detail , maint> reset cdp and position 9. open inlet 10. stand clear and retract |
|
|
Term
this needs to be set before long pull |
|
Definition
|
|
Term
crosshead stop max is what |
|
Definition
Post and Pre OP is 1/2 inch |
|
|
Term
when is two blocking done |
|
Definition
|
|
Term
barricade service stroke is two blocking is this |
|
Definition
service stroke is 160 two blocking is 168 |
|
|
Term
engine service stroke two blocking |
|
Definition
|
|
Term
R-5 topside terminal is done when |
|
Definition
|
|
Term
crosshead stop for newly and old re reeve is what |
|
Definition
1-7 for new 1- 6 1/2 for old |
|
|
Term
purchase cable lays are what |
|
Definition
|
|
Term
|
Definition
1100 feet each total of 2200 |
|
|
Term
retract control indicator controls this |
|
Definition
|
|
Term
anchors are designed for this |
|
Definition
|
|
Term
engine has how many kidneys and zinc anodes each |
|
Definition
2 kidneys and 3 zinc anodes each equalling 6 |
|
|
Term
|
Definition
|
|
Term
what percent of tubes can be clogged |
|
Definition
|
|
Term
SWC has how many U shaped tubes |
|
Definition
|
|
Term
max Engine Temp max Operating Temp Temp to turn on SWC |
|
Definition
|
|
Term
Engine has how many gallons MEC has how many gallons Accum has how many gallons SWC has how many gallons |
|
Definition
|
|
Term
Wobble tank holds how many gallons actual name for wobble tank |
|
Definition
6 1/2 Fluid Replenishment Tank |
|
|
Term
wobble tank is used for what |
|
Definition
remove or add small amounts of fluid to accumulator |
|
|
Term
charge Aux Air to Accumulator |
|
Definition
Close Vent Valve, Open Aux Air , Open Accumulator Air |
|
|
Term
|
Definition
Close vent valve, open Ships Air, Open aux Air |
|
|
Term
Aux Air Flask is charged to what PSI |
|
Definition
|
|
Term
this provides necessary air pressure to charge accumulator |
|
Definition
|
|
Term
accumulator safety head is located where on engine and what PSI will it blow |
|
Definition
|
|
Term
CROV is also designed to do this` |
|
Definition
|
|
Term
|
Definition
meter flow of fluid from MEC to Accumulator
heavy bird = smaller openining |
|
|
Term
operating and arrestment PSI of engine |
|
Definition
|
|
Term
|
Definition
Lay Up 1 is shut off Start Up 1 is start up |
|
|
Term
UPS stand for what what is it how long does it last |
|
Definition
Uninterrupted Power Supply Back Up for ARC 30 traps or 2 hours 30 min |
|
|
Term
Engine Pre Op Post Op Barricade Post Op |
|
Definition
|
|