What is the purpose of the Defense Acquisition System?
Definition
Slides 3
Manage the nation's investment in technology, programs, and product support necessary to achieve the National Security Strategy
Term
What is the objective of the Defense Acquisition System?
Definition
Slide 3
Acquire quality products that satisfy user needs with measurable improvements to mission capability and operational support, in a timely manner, and at a fair and reasonable price.
Term
What is the intent of the current DoD 5000 series revision?
Definition
Slide 6
Create an acquisition policy environment that fosters efficiency, flexibility, creativity, and innovation.
Term
Identify and briefly explain the Evolutionary Acquisition (EA) strategy.
Definition
Slides 8-10
Incremental Development: A desired capability is identified; the end-state requirement is known; and that requirement is met over time by developing several increments, each dependent on available, mature technology.
Term
What are “Exit Criteria?” [Generically]
Definition
Specific accomplishments that must be satisfactorily demonstrated before a program can progress further into the Acquisition framework.
Term
Identify the five phases of the Defense Acquisition System.
Definition
Slides 12-38
1. Materiel Solution Analysis
2. Technology Development
3. Engineering and Manufacturing Development
4. Production and Deployment
5. Operations and Support

I used: https://dap.dau.mil/aphome/das/Pages/Default.aspx
Term
Purpose of the Materiel Solution Analysis Phase
Definition
To analyze and recommend materiel solutions for the capability need identified in the Initial Capabilities Document (ICD). An Analysis of Alternatives (AoA) will be conducted and a Technology Development Strategy (TDS) will be formulated. A draft CDD may also be formulated depending on program circumstances.
Term
Purpose of the Technology Development Phase
Definition
reduce technology risk and to determine the appropriate set of technologies to be integrated into the full system and to demo Critical Technology Elements on Prototypes

Initiated by a successful Milestone A Decision.
Term
Purpose of Engineering and Manufacturing Development Phase
Definition
Develop a system or increment of capability, develop an affordable manufacturing process, minimize logistics footprint.

Begins after Milestone B.
Term
Purpose of Production and Deployment
Definition
Achieve an operational Capability that satisfies mission needs

Contains the LRIP and FRPDR and begins after a successful Milestone C review
Term
Purpose of Operations and Support
Definition
Execute a support program that meets materiel readiness and operational support performance requirements, and sustains the system in the most cost-effective manner over its total life cycle
Term
What is a CDD?
Definition
Capability Development Document:

Defines authoritative, measurable, and testable parameters across 1 or more increments of a materiel capability solution by setting KPPs, KSAs, and additional performance attributes necessary for the acquisition community to design and propose systems and to establish programmatic baselines. The CDD must be validated before the Pre-Engineering and Manufacturing Development (EMD) review and supports the Milestone B decision review. The CDD format is in the JCIDS manual.
Term
What is a CDR?
Definition
Critical Design Review

A multi-disciplined technical review to ensure that a system can proceed into fabrication, demonstration, and test, and can meet stated performance requirements within cost, schedule, risk, and other system constraints.
Term
What is LRIP?
Definition
Low-Rate Initial Production.

The first effort of the Production and Deployment phase. This effort is intended to result in completion of manufacturing development in order to ensure adequate and efficient manufacturing capability and to produce the minimum quantity necessary to provide production or production-representative articles for Initial Operational Test and Evaluation (IOT&E);
At Milestone B, the Milestone Decision Authority (MDA) determines the LRIP quantity for Major Defense Acquisition Programs (MDAPs) and major systems.
Term
What is FRPDR?
Definition
Full-Rate Production Decision Review

A review normally conducted at the conclusion of Low-Rate Initial Production (LRIP) effort that authorizes entry into the Full-Rate Production (FRP)
Term
What is a KSA?
Definition
Key System Attributes

System attributes considered most critical or essential for an effective military capability but not selected as Key Performance Parameters (KPPs)
Term
Provide the purpose and at least 2 approvals provided by the MDA for Milestone A
Definition
Slide 17

Authorizes entry into Technology Development Phase. Requires an approved Initial Capabilities Document (ICD). MDA approves: Technology Development Strategy (TDS), Exit criteria for next phase, Acquisition Decision Memorandum (ADM). Information Requirements: Consideration of technology issues, Analysis of Alternatives, TEMP (T&E strategy only)
Term
Provide the purpose and at least 2 approvals provided by the MDA for Milestone B
Definition
Slide 20

Authorizes entry to Engineering & Manufacturing Development Phase. Requires an approved Capability Development Document (CDD). A PM assigned. MDA approves: Program Initiation, Acquisition Strategy (AS), Acquisition Program Baseline (APB), LRIP Quantities, Exit criteria for next phase, Acquisition Decision Memorandum (ADM)
Term
Provide the purpose and at least 2 approvals provided by the MDA for Milestone C
Definition
Slide 27

Authorizes entry into Production and Deployment Phase. Requires an approved Capability Production Document. MDA approves:; Acquisition Decision Memorandum; Updated Acquisition Strategy and Acquisition Program Baseline; Entry into LRIP for systems that require a LRIP, into production or procurement for systems that do not require LRIP, or into limited deployment for MAIS programs or software intensive systems with no production components; Exit criteria for LRIP if appropriate
Term
How does JCIDS integrate with the 5000 model?
Definition
Slide 39

ICD covers the Materiel Solution Analyses and Technology Development (ends at Milestone B)

CDD covers Engineering & Manufacturing Development (ends at Milestone C)

CPD covers Production and Deployment to Operations and Support
Term
Purpose of AoA?
Definition
Slide 15
To evaluate the Operational Effectiveness (OE), Operational Suitability (OS), and estimated costs of alternative systems to meet a mission capability. Explore advantages and disadvantages and sensitivity to assumptions.
It evaluates: Critical Technologies, Threat, Costs, Mission Needs, Environment. One alternative is always the Status Quo. Use of Models Essential. Develops Measures of Effectiveness (MOEs) and Measures of Performance (MOPs). Thresholds (Min acceptable performance, Max cost, etc). Usually done only once in program lifetime, may do in parts. Feeds Technology Development Strategy
Term
What does MS0 provide?
Definition
Approval to Conduct Concept Studies
Term
What does MSI provide?
Definition
Approval to Begin a New Acquisition Program
Term
What does MSII provide?
Definition
Approval to Enter Engineering & Manufacturing Development
Term
What does MSIII provide?
Definition
Production or Fielding/Deployment Approval
Term
Project Management Fundamentals include:
Definition
Common Vocabulary
Effective Teamwork
Project Cycle
Project Management Essentials
Term
Each increment of incremental design must have what?
Definition
Everything that falls withing Milestones B&C
Term
JCIDS documents and JORC approval directly support whom in making milestone decisions?
Definition
The Defense Acquisition Board
Term
The CBA and ICD take place prior to what?
Definition
The MDD, making them outside of the acquisition process
Term
Entrance Criteria are described where?
Definition
DoDI 5000.02
Term
Exit Criteria are found where?
Definition
Acquisition Decision Memorandum
Term
List 3 entrance criteria for Milestone A
Definition
AoA complete
Proposed Solution
Funding
Term
List 3 entrance criteria for Milestone B
Definition
Tech Maturity
Requirements
Funding
Term
List 1 entrance criteria for Milestone C
Definition
Acceptable performance in DT&E/OA
Term
PDR
Definition
Preliminary Design Review
Ensures that the design traces back to the requirement that it will fulfill your requirements
Term
TRL 6
Definition
System/Subsystem Model or Prototype Demonstrated in a relevant environment
Term
How does a system become a Program of Record (POR)
Definition
By successfully achieving a MS B decision.
Term
What happens after the successful completion of the Post- Critical Design Review Assessment?
Definition
ends ISD and continues into the System Capability and Manufacturing Process Demonstration
Term
ISD
Definition
Integrated System Design: an effort intended to define system and system of systems functionality and interfaces. complete HW & SW detailed design, and reduce system-level risk
Term
What is the purpose of the System Capability and Manufacturing Process Demonstration?
Definition
Demonstrate the ability of the system to operate in a useful way & that production can be supported by demonstrated manufacturing process
Term
The MDA makes the decision to commit the DoD to production at what Milestone?
Definition
C