Shared Flashcard Set

Details

CRJ-200 Checklists
Expanded checklist items from the CRJ
22
Aviation
Professional
09/13/2010

Additional Aviation Flashcards

 


 

Cards

Term

SAFETY CHECKLIST (1st flight or elec power removed, silently by either pilot)

 

Circuit Breakers.......................

     Stab CH1& CH2 HSTCU CB's (2F5&4A1).......

Definition

...Checked  (assure collars)

...Review Location


 

 

 

 

Term
Nosewheel Steering...........................
Definition
...OFF
Term
Hydraulic Pumps............................
Definition
...OFF
Term
Gear Lever.............................
Definition
...Down
Term
Spoiler Lever.........................
Definition
...Retracted
Term
Flap Lever.............................
Definition

...Set to Position

Term
RADAR.................................
Definition

...OFF

Term
ADG Manual Release..........................
Definition
...In/Stowed
Term
Battery Master.............................
Definition

...On

Check ED2 DC synoptic page

22v Min. (5 min limitation for cooling)

Term
APU Fire Detection Test....................
Definition

Verify there is no APU FIRE FAIL

Test switch WARN

1. Aural: Triple chime, Fire Bell, "jetpipe overheat"

2. Glare: APU FIRE PUSH red, APU BOTTLE ARMED Push to discharge green

3. APU FIRE red warning msg

4. release switch and all disappear.

...COMPLETE

Term
APU Fire Extinguisher Test................
Definition

APU BOTTLE switch: test position

1. APU SQUIB 1 & 2 advisories

2. After 5 seconds External APU horn sounds

APU BOTTLE switch: release

1. Horn Stops

2. After 5 secs eicas advisories flicker then disappear.

...COMPLETE

Term
APU/Electrics/Air Conditioning.............
Definition

...........Start / Establish

 

Breakdown for each is in the next slides

Term
Starting APU
Definition

Before Starting APU:

1. Apu gen switch is off

2. APU LCV is closed (bleed air panel)

APU, PWR FUEL switch: Select

1. APU SOV OPEN

2. APU IN BITE

3. APU Gauges

4. APU DOOR OPEN msg

APU, Start / Stop Switch: Select

1. APU START white status msg

2. APU lightoff

3. 50% RPM, START light extinguishes, APU START msg removed

4. 95% + 4 sec: AVAIL indication (green) for the bleed air

Term
Establishing Electrical Power (APU electrics)
Definition

APU GEN switch: ON

 

Select the AC synoptic page on ED2:

1. Check Voltage, Freeq, Load, all busses are powered (normal operation)


Select the DC synoptic page on ED2:

1. Check TRU voltage, Load, all busses powered (normal operation)

Term
Establishing Air Conditioning (packs on APU)
Definition

Packs may be xfered to APU 2 min after starting


L&R 10th STAGE SOV switchlights: select out

1. Status msgs displayed (stages closed)

2. Switchlights illuminate Closed

APU LCV switchlight: Select In (open)

1. APU LCV OPEN status msg

2. APU LCV switchlight illuminates OPEN

10th STAGE ISOL switchlight: select in (OPEN)

1. 10th STAGE ISOL OPEN status msg

2. 10th STAGE ISOL switchlight illuminated OPEN (white)

L & R PACK switchlights : select in

1. L PACK OFF and R PACK OFF status msgs removed

2. L & R PACK switchlights extinguish

Term
Compass (BOTH).........................
Definition

...MAG

with AHRS initialization takes 30-70 sec

in DG mode, alignment takes up to 11min

Term
Nosewheel Area.......................
Definition
...CLEAR
Term
Hydraulic Pump 3A......................
Definition
...ON
Term
Nosewheel Door........................
Definition

ED1, check to make sure NOSE DOOR OPEN warning msg removed

 

...CLOSED

Term
PARKING BRAKE................
Definition
...Set & Checked
Term
NAV Lights.......................
Definition
...ON
Term
FMS Initialization........................
Definition

Make sure you activate the most recent database and its current

 

POS INIT the FMS

 

...SET

Supporting users have an ad free experience!