Term
What is the intent of the Sustainable Sites Credit Category? |
|
Definition
-reward decisions about environment surrounding the building with credits that emphasize the virtual relationships among buildings, ecosystems and ecosystem services |
|
|
Term
What is the intent of the Construction Activity Pollution Prevention Prerequisite? |
|
Definition
reduce pollution from construction activities by controlling soil erosion, sedimentation and airborne dust |
|
|
Term
What are the requirements for the Construction Activity Pollution Prevention Prerequisite? |
|
Definition
-create and implement soil erosion and sedimentation control plan for all construction activities that meets either 1.)2012 EPA Construction General Permit 2.)Local erosion and sedimentation codes |
|
|
Term
What are some technologies available to achieve the Construction Activity Pollution Prevention Prerequisite? |
|
Definition
-temporary or permanent seeding -mulching -dikes -silt fences -sediment traps/basins |
|
|
Term
What is the intent of the Site Assessment Credit? |
|
Definition
assess site condition before design to evaluate sustainable options and inform related decisions |
|
|
Term
What are the requirements of the Site Assessment credit? |
|
Definition
complete site survey including: -topography -hydrology -climate -vegetation -soils -human use -human health effects |
|
|
Term
What is the intent of the Protect/Restore Habitat credit? |
|
Definition
conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity |
|
|
Term
What are the 2 options of requirements for the Protect/Restore Habitat credit? |
|
Definition
-preserve and protect construction activity on 40% of the greenfield area on site 1.)On site restoration: native vegetation, restore 30% of all portions of site identified as previously developed 2.)Financial support: provide financial support to at least $.4/sq ft for total site area. Must be a nationally or locally land trust/ conservation org. within same EPA region |
|
|
Term
What is the intent of the Open Space credit? |
|
Definition
create exterior open space that encourages interaction with environment, social, recreational and physical activity |
|
|
Term
What are the requirements for the Open Space credit? |
|
Definition
-provide outdoor space >=30% total site -minimum 25% must be vegetated or have overhead vegetated canopy -pedestrian oriented paving for social activity -rec-oriented paving for physical activity -garden space for year-round visual interest -garden space for community/urban food production -preserve/created habitat meets criteria of SS Credit Site Development |
|
|
Term
What is the intent of the Rainwater MGMT credit? |
|
Definition
Reduce runoff and improve water quality by replicating natural hydrology and water balance of site based on historical conditions |
|
|
Term
What are the requirements of the Rainwater MGMT credit? |
|
Definition
1.)Percentile of Rainfall Events 2.)Natural land cover |
|
|
Term
What are the different paths used in the Percentile of Rainfall Events requirement under the Rainwater MGMT credit? |
|
Definition
Path 1.) 95th percentile (3pts, 2HC) -manage on site the runoff from developed site for 95th percentile of regional or local rainfall events using low impact development and green infrastructure Path 2.) 98th percentile (3pts, 2HC) Path 3.)zero lot line projects only -urban areas minimum density 1.5 far -manage runoff from developed site for 85th percentile of regional or local rainfall |
|
|
Term
What is the intent of the Heat Island Reduction credit? |
|
Definition
minimize effects on microclimate and human and wildlife habitats by reducing heat islands |
|
|
Term
What are the 2 requirement options for the Heat Island Effect? |
|
Definition
1.)Nonroof and roof (2pts, 1 HC) -combo of: -nonroof: plants, shade structures with high SRI, vegetated structures, high SRI paving materials, open grid paving -high reflectance roof: SRI for a low sloped roof must be an 82 or 64 after 3 years. Steep slope must be a 39 or 32 after 3 years -vegetated roof Option 2.) Parking under cover -minimum 75% parking under cover -any roof used must have 3 yr SRI of 32, use materials w/ initial SRI of 39 -be vegetated -or be covered with RE generation systems |
|
|
Term
|
Definition
difference in thermal gradient between developed areas |
|
|
Term
|
Definition
absorption of heat by hardscapes such as dark, non-reflective pavement and buildings |
|
|
Term
|
Definition
ability of a surface to reflect sunlight on a scale of 0-1 with 0 being the least reflective and 1 being the most |
|
|
Term
|
Definition
ratio of radiation emitted by a surface to radiation of a blackbody at same temperature -measured on a scale of 0-1 with 0 being the most reflective and 1 being the blackbody |
|
|
Term
|
Definition
ability of a surface to shed thermal radiation on a scale of 0-1 with 0 being the least and 1 being perfect emitter |
|
|
Term
Solar Reflectance Index (SRI) |
|
Definition
Ability of a surface to reject solar heat on a scale of 0-100. Higher the rating, the better it is at rejecting solar heat. It is a combo of reflectance and emittance |
|
|
Term
What is the intent of the Light pollution Reduction credit? |
|
Definition
increase night sky access, visibility and reduce consequences of development for wildlife and people |
|
|
Term
What are the requirements of the Light Pollution Reduction credit? |
|
Definition
-meet uplight and trespass requirements by using backlight-uplight-glare (BUG) method -do not exceed given % of total lumens emitted above horizontal |
|
|
Term
What is light trespass and BUG? |
|
Definition
BUG: backlight-uplight-glare -do not exceed given luinaires backlight and glare ratings (based on a light source installed in lumenaires) as defined in TM-15-11 Adendum A based on mounting location and distance from lighting boundary -do not exceed given vertical illuminances at lighting boundary |
|
|
Term
What is the intent of the Tenant Design and Construction Guidelines credit and which rating system is it used in? |
|
Definition
-used only in C+S -educate tenants in implementing sustainable design and construction features in their tenant improvement build-outs |
|
|
Term
What are the requirements of the Tenant Design and Construction Guidelines credit? |
|
Definition
Publish illustrated doc including -description of sustainable features, goals, objectives in project -recommendations of sustainable strategies, products, materials and services -info that enables a tenant to coordinate space design and construction with building systems |
|
|
Term
What is the intent of the Site Master Plan for Schools credit? |
|
Definition
-ensure sustainable site benefits are being achieved by project regardless of future changes |
|
|
Term
What are the requirements for the Site Master Plan for Schools credit? |
|
Definition
-achieve 4/6 credits and use associated calc methods LT: High priority site SS: site development SS: open space SS: rainwater mgmt SS: heat island reduction SS: light pollution reduction |
|
|
Term
What is the intent of Joint Use of Facilities in Schools credit? |
|
Definition
- integrate school with community by sharing building and its playing fields for non-school events |
|
|
Term
What are the 3 ways to meet the requirements for the Joint Use of Facilities in Schools credit? |
|
Definition
1.) make at least 3 spaces available for public use or provide access to toilets after normal school hours 2.)contract with community or other organizations to provide at least 2 types dedicated use spaces in building 3.)2 spaces are owned by other organizations and are accessible to students |
|
|
Term
What is the intent of the Place of Respite for Healthcare credit? |
|
Definition
provide patients, staff and visitors with health benefits of the national environment by creating outdoor places of respite |
|
|
Term
What are the requiremtns for the Place of Respite credit? |
|
Definition
places accessible to patients and visitors are 5% of net usable program area. Additional area to staff for 2% -must be outdoors with up to 30% indoors if inside greehouses or solarium -accessible within 200ft of entrance -located where no medical intervention is delivered -options for shade and direct sun with at least 1 seat/200ft2 -therapy unavailable to all buildings must make up <=50% -universal access trails <=30% -min 25% vegetated space -not within 25ft of smoking area |
|
|
Term
What is the intent of direct exterior access credit? |
|
Definition
-provide patients with health benefits associated to access with environment |
|
|
Term
What are the requirements for the direct exterior access credit? |
|
Definition
access to exterior courtyard, terrace, garden or balcony -5ft per patient for 75% of all inpatients and 75% of qualifying outpatients whose stay exceeds 4hrs |
|
|
Term
What constitutes "open space" |
|
Definition
project property-development footprint |
|
|