Term
|
Definition
assigned to identify requisitions and related documents applicable to specific projects or programs |
|
|
Term
|
Definition
material to repair SE that is inoperative and a workaround, redundancy, or local back up is available. |
|
|
Term
|
Definition
material to stop an AWP condition on a specific end item or component undergoing repair. |
|
|
Term
|
Definition
material to stop an AWP condition on components and airx engines directly related to airx support; repairs for bare firewalls. |
|
|
Term
|
Definition
"Broad Arrow" (SE Inoperative; for nonoperational SE used in direct support of operational airx for which there in no redundancy |
|
|
Term
|
Definition
engine maintenance work stoppages for all model airx engines; NOT used for repairs for bare firewalls: see ZC8 |
|
|
Term
|
Definition
|
|
Term
|
Definition
Support of NMC or PMC aircraft. NMCS and PMCS items, based on a valid outstanding requisition held by supply (EXREP), or work requests causing NMC or PMC conditions on aircraft, will be assigned Priority 1; also assigned to activities within 30 days of deployment. |
|
|
Term
|
Definition
Repair of noncritical LRCAs and SE, and repair or manufacture of material for non-fixed allowance stock. |
|
|
Term
|
Definition
Processing of salvaged material and non-aeronautical work. |
|
|
Term
For deployed MALS, afloat and overseas IMAs, GB requisition series should only be used with ____ project code. |
|
Definition
|
|
Term
CONUS IMAs and MALS will assign ____ series document numbers to ZF7 requirements. |
|
Definition
|
|
Term
All activities in the Navy are assigned a FAD for determining |
|
Definition
priorities for material support based on their mission. |
|
|
Term
Instructions for using the material priority system and for assigning FADs are in ____ |
|
Definition
|
|
Term
FAD is correlated with an ____ ____ ____ ____ to determine the priority assigned to requisitions. |
|
Definition
urgency of need requirement |
|
|
Term
Force/Activity Designator |
|
Definition
|
|
Term
F/AD is a Roman numeral (I-V) that identifies and categorizes ____ |
|
Definition
a force or activity on the basis of its military importance |
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
Positioned to Deploy/Combat |
|
|
Term
|
Definition
Other Active and Selected Reserve Forces |
|
|
Term
|
Definition
|
|
Term
The Urgency of Need Designator (UND) consists of ____ |
|
Definition
an uppercase letter “A,” “B,” or “C.” |
|
|
Term
It is selected to indicate ____ |
|
Definition
the relative urgency of a force’s or activity’s need for a required item of material |
|
|
Term
Assignment of UND is the responsibility of ____ and is derived according to ____ |
|
Definition
the force or activity making the requisition; NAVSUP P-485 |
|
|
Term
|
Definition
Requirement is immediate. Without material, the activity is unable to perform one or more of its primary missions. |
|
|
Term
|
Definition
Requirement is immediate or it is known that such a requirement will occur in the immediate futureThe activity’s ability to perform one or more of its primary missions will be impaired until the material is received. |
|
|
Term
|
Definition
|
|
Term
The ____ is used to record acceptance information, custody and transfer, rework, preservation and depreservation, TDs, and any other miscellaneous history required to accompany the SE throughout its service life. |
|
Definition
SE Custody and Maintenance History Record (CNAF 4790/51) |
|
|
Term
Under what circumstance shall cannibalization be performed to create a pool of RFI parts for general use to support flight operations or detachments? |
|
Definition
|
|
Term
Authority for aircraft/equipment cannibalization between squadrons within a Type Wing/Air Wing shall be requested from ____. |
|
Definition
the respective Wing Commander |
|
|
Term
The approving ____ shall direct the cannibalization action via ____ to include the supporting aviation support activity as an action addressee for the required supply support action. |
|
Definition
Wing Commander; naval message |
|
|
Term
Authority for aircraft/equipment cannibalization between MAGs or Air Wings, or cannibalization from aircraft that have been non-mission capable in excess of 120 days, shall be requested via ____ by the requiring ____ from the respective ____. |
|
Definition
naval message; Wing Commander; TYCOM |
|
|
Term
COMNAVAIRFOR (N423) is the approval authority for ____ |
|
Definition
COMNAVAIRFOR and COMNAVAIRFORES aircraft/equipment. |
|
|
Term
COMNAVAIRSYSCOM (AIR-5.0D) is the approval authority for ____ |
|
Definition
COMNAVAIRSYSCOM aircraft/equipment. |
|
|
Term
CNATRA (N421) is the approval authority for ____ |
|
Definition
CNATRA aircraft/equipment. |
|
|
Term
Cannibalization for Broad Arrow from another site requires ____ |
|
Definition
|
|
Term
____ are responsible for the accurate assignment of PDs consistent with the F/AD and UND. |
|
Definition
Commanding Officers of the requisitioning installations |
|
|
Term
____ shall validate F/AD I usage through the requisitioning process |
|
Definition
|
|
Term
PDs _, _, and _ form IPG I, processing time ____. |
|
Definition
|
|
Term
PDs _, _, _, _, and _ form IPG II, processing time ____. |
|
Definition
04, 05, 06, 07 and 08; 2 hours |
|
|
Term
PDs _, _, _, _, _, _, and _ form IPG III, processing time ____. |
|
Definition
09, 10, 11, 12, 13, 14, and 15; 24 hours |
|
|
Term
|
Definition
Repair Not Authorized; The activity is specifically not authorized to repair the item in applicable directives. |
|
|
Term
|
Definition
Lack of Equipment, Tools, or Facilities; The repair is authorized but cannot be performed due to lack of equipment, tools, or facilities. |
|
|
Term
|
Definition
Lack of Technical Skills;The repair is authorized but cannot be performed due to a lack of technical skills. |
|
|
Term
|
Definition
Lack of Parts; Repair is authorized but cannot be performed because required parts will not be available. |
|
|
Term
|
Definition
Fails Check and Test; The activity's authorized level of maintenance is limited to check and test only and repair is required. |
|
|
Term
|
Definition
Lack of Technical Data; Repair is authorized but cannot be performed due to a lack of technical data. |
|
|
Term
|
Definition
Beyond Authorized Repair Depth; Some level of repair beyond check and test is authorized, but the maintenance function required to return the item to a RFI condition is not assigned by SM&R code, MIMs, maintenance plan, or other technical decision. |
|
|
Term
|
Definition
Administrative; Repair is authorized and feasible but not attempted due to an EI exhibit, SRC data unknown and cannot be determined, item under warranty, I-level repair costs exceed AVDLR Net Unit Price or replacement cost, excessive backlog, budgetary limitations, materials in excess of requirements, or when specifically directed by the ACC/TYCOM. |
|
|
Term
The determination to use BCM 8 for excessive backlog will be made ____ |
|
Definition
jointly by the maintenance and supply officers. |
|
|
Term
BCM 8 for materials in excess of requirements or budgetary limitations require ____ |
|
Definition
|
|
Term
|
Definition
Condemned; A repairable item is so severely worn or damaged that repair is not feasible, as determined by local maintenance personnel, or specifically directed by ACC/TYCOM. |
|
|
Term
BCM 4 is authorized only if the action meets one of the following conditions: |
|
Definition
a. The unit requiring the material is in FAD II or higher. b. The unit requiring the material is in FAD III, but is directly supporting a deploying, deployed or forward deployed FAD II unit. |
|
|
Term
The Aircraft Inventory Record (Equipment List) (_REF_) |
|
Definition
|
|
Term
Naval Aircraft Flight Record (_REF_) |
|
Definition
|
|
Term
|
Definition
Repair of critical LRCAs and SE. This priority is also assigned to O-level maintenance activity's work stoppage requirements. |
|
|
Term
Workload Priorities Assignment Priority 1 |
|
Definition
Support of NMC or PMC aircraft. NMCS and PMCS items, based on a valid outstanding requisition held by supply (EXREP), or work requests causing NMC or PMC conditions on aircraft, will be assigned Priority 1. This priority is also assigned to activities within 30 days of deployment. |
|
|
Term
Workload Priorities Assignment Priority 2 |
|
Definition
Repair of critical LRCAs and SE. This priority is also assigned to O-level maintenance activity's work stoppage requirements. |
|
|
Term
Workload Priorities Assignment Priority 3 |
|
Definition
Repair of noncritical LRCAs and SE, and repair or manufacture of material for nonfixed allowance stock. |
|
|
Term
Workload Priorities Assignment Priority 4 |
|
Definition
Processing of salvaged material and nonaeronautical work. |
|
|