CM 433 Final
Ch. 3-6 key terms + lecture notes
20
Other
Undergraduate 4
06/01/2011

Additional Other Flashcards

 


 

Cards

Term
DBIA
Definition
Design - Build Institute of America
Term
9 primary characteristics that distinguish DB from DBB
Definition

1.Solicitation and basis of award

2.Team approach

3. the design-build entity

4. risk management

5. performance requirements

6.who controls the details of the design

7.the design cost relationship

8.the integrated design-build schedule

9. contracting approach

Term
IFB
Definition

Invitation for Bids

 

(Design - Bid - Build)

Term
RFP
Definition

Request for Proposal

 

(design-build)

Term
BRAC
Definition
Base Realignment and Closure Commision
Term
FAR
Definition
Federal Acquisitions Regulations
Term
Contractor-Led Design-Build
Definition
construction firm serving in the prime contract position with the owner. Hires architecture firm.
Term
Designer Led Design- Build
Definition
Design firm holds prime contract with owner and hires out the construction services to a GC
Term
Design Specifications
Definition

DBB

Set of completed drawings prepared by the designers and specs

 

Term
Prescriptive specifications
Definition

DBB

Completed set of drawings

Term
Performance Requirements
Definition

DB

what the owner wants

Term
ASHRAE
Definition
American Society of Heating, Refrigerating and Air Conditioning Engineers
Term
EJCDC
Definition
Engineers Joint Contract Documents Committee
Term
IFOA
Definition
Integrated Form of Agreement
Term
QBS
Definition
Qualifications-Based Selection
Term
GMP
Definition
Guaranteed Maximum Price
Term
DBOM
Definition
Design Build Operate Maintain
Term
BAFO
Definition
Best and Final Offer
Term
LEED
Definition
Leadership in Energy and Environmental Design