Term
Who must make the first entry and sign the DD form 1753? |
|
Definition
|
|
Term
The circuit data record serves |
|
Definition
primarily to assist the systems control facility in troubleshooting and circuit restoration |
|
|
Term
How long do you retain a circuit data record (DD Form 1441) after a circuit is deactivated? |
|
Definition
|
|
Term
Use the telecommunications service order (TSO) as a primary source document when you fill out |
|
Definition
|
|
Term
What form is used as the primary source of information when preparing defense information infrastructure status reports? |
|
Definition
|
|
Term
You receive a TSO at your systems control to move a circuit to another channel. What DD Form must you fill out and put in the circuit history folder along with the TSO? |
|
Definition
|
|
Term
Which test results do you record on the reverse/back side of the DD Form 1697-Analog? |
|
Definition
Frequency response and envelope delay |
|
|
Term
Envelope delay measurements are referenced to |
|
Definition
|
|
Term
How long must an exception report be maintained in the circuit history folder at an intermediate facility? |
|
Definition
Until an in-effect report is submitted |
|
|
Term
Which DISAC governs defense information infrastructure status reporting? |
|
Definition
|
|
Term
What type of report has historical information that is used for computer-assisted analysis of the performance of the defense information infrastructure? |
|
Definition
|
|
Term
Who does not have the authority to designate special interest items? |
|
Definition
|
|
Term
Which of these conditions is considered a hazardous condition and requires reporting IAW DISAC 310-55-1? |
|
Definition
Loss of diversity on a radio link |
|
|
Term
What process obtains information for use in the preparation of communications services requirements documents using a record drawing, available data, and telephone coordination? |
|
Definition
|
|
Term
Who serves as systems engineering technical advisers for the MAJCOMs and wing commanders? |
|
Definition
Systems telecommunications engineering manager |
|
|
Term
Who is authorized to submit a request for service to DISA? |
|
Definition
Telecommunications certification office |
|
|
Term
What document is submitted to the national communications service for TSP assignment? |
|
Definition
|
|
Term
The first position of a TSO number represents the |
|
Definition
|
|
Term
What document identifies the leased service, the commercial carrier, circuit demarcation points, and the required circuit parameters the commercial carrier must meet? |
|
Definition
Service acquisition message |
|
|
Term
Which DISAC provides guidance for circuit QC parameters? |
|
Definition
|
|
Term
Within how many normal duty hours of completion action of the TSO must the CCO submit an in-effect report? |
|
Definition
|
|
Term
What report must be sent if the circuit does not meet all required parameters and the TSO issuing authority advises that the circuit is accepted for service? |
|
Definition
|
|
Term
Which DISAC contains information needed to assign a temporary CCSD? |
|
Definition
|
|
Term
Within how many working days after a major change (e.g., activation/deactivation of a link) occurs do you have to report facility/link data to DISA? |
|
Definition
|
|
Term
Within how many working days after a routine change (e.g., room numbers) occurs do you have to report facility/link data to DISA? |
|
Definition
|
|
Term
What table of allowance (TA) prescribes items and quantities of equipment authorized to perform the assigned systems control peacetime and wartime missions? |
|
Definition
|
|
Term
What type of document identifies test equipment that has not been updated and has exceeded its calibration date, is currently in maintenance, and is due calibration within the next two months? |
|
Definition
|
|
Term
What plan do commanders in chief in the overseas theaters to assign certain priority circuit requirements during stressed conditions use? |
|
Definition
Minimum essential circuit list (MECL) |
|
|
Term
When DISA restoral plans (R-plan) are not sufficient or available, what plan is developed to provide continuous service to high priority users during link and system failures? |
|
Definition
Local restoral plan (LRP) |
|
|
Term
When you must restore user service by rerouting, what is the second type of circuit you preempt? |
|
Definition
Nonactive on-call circuits |
|
|
Term
Who has the authority to approve funding for the leasing of additional circuits during an authorized outage? |
|
Definition
|
|
Term
The DOCC element does not require user release on circuits with TSP of 3 and lower if the duration of scheduled service interruption is less than |
|
Definition
|
|
Term
No less than how many days notification does DISA provide the facility that is to receive a performance evaluation? |
|
Definition
|
|