Term
4. A builder can show compliance with every building requirements by "fleet averaging", provided that approved calculation methods or ______ had been used. |
|
Definition
The point system "Fleet averaging" means to use average figures for all units in the same subdivision. |
|
|
Term
5. Under what title is the energy code found for new building construction? |
|
Definition
|
|
Term
6. The standard distance from the bottom of a non prefabricated door to the doorknob is: |
|
Definition
|
|
Term
11, How many cubic yards of concrete will be required for the four-inch thick patio slab? |
|
Definition
9 cubic yard / yard=feet 1 cubic yard = 27 cubic feet |
|
|
Term
13. What is the minimum width of a standard water closet? |
|
Definition
|
|
Term
14. To calculate the area of a gable, multiply the length by the height and divide by two. True or False. |
|
Definition
|
|
Term
15. How many squares for roofing material foes it takes to cover a 20'x40' flat roof? |
|
Definition
|
|
Term
16. A 1 low lamp is connected to a 220V line. What is the resistance in ohms? |
|
Definition
|
|
Term
18. How many tons of cooling capacity does a 60,000 Btu cooling unit have? |
|
Definition
|
|
Term
37. Smoke detectors must be added to residential building when additions, repairs, or works of improvement require a permit and have a value in excess of: |
|
Definition
|
|
Term
38. Maximum spacing for anchor bolts in sills is: |
|
Definition
6' o.c. and within 12" of ends |
|
|
Term
39. According to the 1985 UBC, anchor bolts must be embedded in concrete or reinforced masonry at least: |
|
Definition
|
|
Term
40. Which is the best choice for moisture resistance? |
|
Definition
|
|
Term
41. What sort of subfloor material would you use if the edges meet over the floor joist? |
|
Definition
|
|
Term
42. The access opening and passageway for a furnace mounted below the floor is: |
|
Definition
|
|
Term
43. When using a back hoe on a job to dig an 8' trench, you should: |
|
Definition
|
|
Term
44. Given a building of 180,000 cubic feet, and a fan than can produce 1000 cu. Ffmin., how many fans would you need to accomplish four air changes per hour? |
|
Definition
|
|
Term
45. If a fan needs 2.4 kW and electrical energy costs $0.15 /kWh, how much would it cost to run the fan for 10 hours? |
|
Definition
|
|
Term
46. A framing contractor changes a framing design to save money and time. Who is responsible for the structure? |
|
Definition
|
|
Term
47. The maximum spacing of anchor bohs is: |
|
Definition
|
|
Term
48. Attach a sill to concrete with: |
|
Definition
|
|
Term
49. What is the minimum size rebar for a single- family residence? |
|
Definition
|
|
Term
50. If a footing cracks, it was most likely caused by: |
|
Definition
Poor soil stability Concrete has a low tensile strength. If, for example, the soil erodes underneath a footing, the concrete bends and the resulting tensile stress causes cracks. |
|
|
Term
51. The standard size of a single garage door is: |
|
Definition
|
|
Term
52. When cutting with a saber saw: |
|
Definition
|
|
Term
53. Figure the EER of an A/C unit: 3,000 watts, 24,000 BTUH. |
|
Definition
|
|
Term
54. A fan delivers 15,000 CFM when operating at 600 RPM. How many RPM will be required to deliver 20,000 CFM? |
|
Definition
|
|
Term
55. If 1\2" = r, what does 1\8 equal? |
|
Definition
|
|
Term
56. What is the surface square footage of a circular patio siab with a 12' radius? |
|
Definition
|
|
Term
58. If a motor uses 2.5 kW at SO. 15 per kWh, how much would it cost to run the motor for one day? |
|
Definition
$9.00 (2.5 kW X $0.15 X 24 hours) |
|
|
Term
59. How many bricks will be needed in a masonry wall 24' X 12' ? Blocks are 8 1\2" long x 3 1\4" bigh and grout to be 1\2 " thick. |
|
Definition
|
|
Term
60. Construction or reconstruction on railroad right-of-ways is regulated by________of the state of California. |
|
Definition
Public Utilities Commission (PUC) |
|
|
Term
61. How much notice do you have to give before working near or around a railroad track, and to whom? |
|
Definition
24-hour notice, to the nearest railroad engineering office. |
|
|
Term
62. What is a "Walkway" in connection with a railroad track? |
|
Definition
A walking area running along side and adjacent (next) to a railroad track in the same direction. |
|
|
Term
63. When the contractor finds a damaged utility, he should notify: |
|
Definition
The property owner and utility company. |
|
|
Term
64. If a contractor finds a violation of code in a building plan which has been approved, what should be done? |
|
Definition
Notify the architect and then the building official. |
|
|
Term
65. Who is responsible for producing the structural drawings? |
|
Definition
|
|
Term
66. Whose plan do you follow after you get a soil report from an engineer? |
|
Definition
Follow the soil engineer's plan only. |
|
|
Term
67. If a contractor decided to alter (change) the design of a structure and it collapsed, who would be responsible or that? |
|
Definition
|
|
Term
68. When the contractor finds a 6" error on the construction plan, who should he contact? |
|
Definition
|
|
Term
69. Where should an approved set of building plans be kept? |
|
Definition
|
|
Term
70. What is the statute law that states the energy code for the new building construction? |
|
Definition
Title 24 of the California Code of Regulations. |
|
|
Term
71. What type of system does the Energy Conservation System work on? |
|
Definition
|
|