Term
The service (s) that has potential for none or very few CMLs on circuit
Definition
  1. Olefin Cold Side,
  2. Anhydrous Ammonia

 

Answer found API 570: 5.6.2

Term
Service (s) that Valves should be inspected for thermal fatigue
Definition

Cat Reformer

 

 

See API 570 section 5.10

Term
Service(s) with reatively uniform corrosion
Definition
  1. Sulfidation,
  2. Sour Water

 

Answer found API 570: 5.6.3

Term

 What class abbreviation is used to help define the

 API 570  Repair Organization

Definition

JOC 

 

J= one who is autherized by the Jurisdiction

 

O= Owner/User who repairs thier own equipment

 

C= Contractor that is acceptble to Owner/User

 

 

Answer found in API 570: 3.1.79

 

Term

What class abbreviation is used to help define the

 API 570 Authorized Inspection Agency

 (AI's Employer) 

Definition

JUIC

 

J= Inspection Org. of the Jurisdiction

 

 

U = Owner/User who maintians inspection Org. 

 

I = Inspection Org. of an Insurance Company

 

C= Contractor employed by  Owner /User

 

Answer found in API 570: 3.1.6

Term

The class abbreviation that is used to help:

Determine of corrosion Rate for New Service or Change in Service

is?

Definition

SOPI

 

S= Same or Similar Service,

O= Owners Experience,

P= Published Data, or

I= Inspection in 3 months

 

 

Answer found in API 570:7.1.2

 

 

Term

What is the Class Abbreviation to help reminber the

Primary Resonsiblities of API 570 Authorized Inspector

Definition

TIE 

T= Testing

I= Inspection

E= Examination

 

 

Answer found in API 570: 4.3.4

Term

 AIRRis the Class Abbreviation for?

Definition

API 570 Scope which is:

                                     A  Alteration,

                                     I   Inspection,

                                     R  Repair,

                                     R  Rerate.

 

Answer found in API 570: 1.1.1

 

Term
On repairs the minimum radius of an insert patch is
Definition

Min of a 1" Radius

 

Answer found

 API 570: 8.1.4.2.c/ Fig C.2

 

 

Term
When performing NDE inspection what is the maximum diameter of the CML examination point for lines equal to or less than 10 NPS
Definition

 max dia. of 2"

 

Answer found API 570 : 3.1.20

Term
When performing NDE examinations of lines greater than 10 NPS what is the maximum diameter of the CML
Definition

Max dia. of 3"

 

Answer found API 570 : 3.1.20

Term
For partially buried pipe What is the soil-to-air distance above the soil interface that is considered for corrosion
Definition

6" above soil interace shall be considered

 

 

Answer found  API 570:3.1.87

Term
What is the distance below the soil interface to dig when inspecting for soil-to-air corrosion
Definition

 dig 6"-12" when inspection for soil-to-air corrosion

 

Answer found API 570: 7.4.5

Term
For partially buried pipe What is the soil-to-air distance below the soil interface that is to be  considered for corrosion
Definition

12" below soil interface

 

 

Answer found

API 570: 3.1.87

Term
At an Injection point curcuit what is the minimum upsteam limit of a more extensive examination.
Definition

minimum 12" upsteam of the injection nozzle shall be examined

 

Answer found API 570: 5.5.9

Term
For underground piping what is the minimum length of buried pipe to expose when excavating for inspection
Definition

6 to 8 feet will need to be excavated for inspection

 

Answer found API 570: 9.3.6

Term

Difine:

ALTERATION

Definition

Alteration is a Physical change in any component that has design implications.

 

Note: Comparable or duplicate replacements and the  addition of small-bore attachments that do not require reinforcement or additional support are not considered an alteration

 

Answer found in API 570: 3.1.2

Term

Define:

Repair

Definition

Restore to Suitable condiction for safe operation at designed condition 

 

Answer found in API 570: 3.1.78

 

Term

Define:

Defect

Definition

Defect is difined as

An Inperfection that exceeds acceptance criteria

 

Answer found in API 570: 3.1.17

Term

Define:

 Inperfection

Definition

Discontinuity that may or may not exceed the acceptance criteria

 

Answer found in API 570: 3.1.30

Term
RBI's two Primary factors are?
Definition
  1. Probability of failure
  2. Consequence of failure

Answer found in API 570:5.2

 

Term
What word is used to define the number of CML's to obtain thickness readings during NDE inspection
Definition

Represent-ative

 

Representative sampling should include data for all the various types of components and orientations found in each cicuit.

 

Answer found in API 570: 6.5

 

Term
CML's that shall be measured during a Thickness NDE Inspections, are?
Definition

CMLs with the earliest renewal date

as of the previous inspection

 

Answer found in API 570: 6.5

 

Term
Intervals for Pressure-relieving devices (PRD's) are determined by:
Definition

Performance

 

The API 570 sec 6.7.3.1 states that PRD's shall be tested and inspected at intervals that are frequent enough to verify that the valves perform reliably in the particular service conditions.

 

Answer found in API 570: 6.7.3.1

Term
API 570 Piping Classification Inspection scheme in section 6.3.4 is based on:
Definition

Consequence of failure

 

  

See API 570 6.3.1 

Term
Corrosion -Method by which process leaks can lead to brittle failure is
Definition

Auto-Refigeration

 

 

 

 

API 570 section 6.3.4.2.a

Term
Crrosion- Type of soil that is most corrosive is soil with
Definition

Low Resistivity

 

 

Answer found in

API 570 section 9.2.4

 

Term
Number of Repairs of new flange assemblies to be inspected during repairs and alterations is refered to as
Definition

Representative

 

API 570 section 5.12 States: The markings on a representative sample of newly installed fasteners and gaskets should be examined to determine whether they meet the material specification.

 

Answer found API 570: 5.12

Term
What pipe size is RT preferred for thickness readings
Definition

≤ 1 NPS

 

570: 5.7.1

Term
What is the pipe size where UT thickness reading may require specialized UT equipment
Definition

≤ 2 NPS

 

570 5.7.1

Term
The term small bore piping refers to piping that is
Definition

≤ 2 NPS

 

570 3.1.86

Term
What P-numbers allow the use of pre-heat in lieu of PWHT
Definition

P1 & P3

 

570: 8.2.3.2

Term
For flanges, the thread engagement acceptance criteria is
Definition

-1

 

570: 5.12

B31.3:335.2.3

 

Term
What is the minimum # of thremocouples required when performing a local PWHT instead of a 360 degree band
Definition

2

 

570:8.2.3.3.d

Term
 When performing an  Internal Inspection on piping, What code should be followed ?
Definition

API 510 

Pressure Vessel Inspection Code

 

Answer found API 570 5.5.1

Term

What recommended practice is used for

Positive Meterial Indentification (PMI)

Definition

API 578

 

 

 

The Recommedned Pratice for:

Material Verification Program for New and Existing Piping Systems

  

Answer can be found in  API 570 sec 5.9

 

Term

What Standard is used for 

 Fitness for Service (FFS)

Definition

 API 579

 

 

 

Answer is found in API 570: 7.4

Term

What Recommended Practice covers

 Risk based Inspections

 

 

 

Answer found API 570: 5.2

Definition

 

API 580

 

 

 

 

Answer found in

API 570: 5.2

Term

 Which standard covers

Valve Inspection and Testing

Definition

API 598


 

Answer is found API 570: 5.10

 

Term

 What is the Recommended Practice for

Cathodic Protection

Definition

 API 651

 

 

 

 

Cathodic Protection of aboveground Petroleum Storage Tanks

 

Answer found in API 570: 9.3.5

Term

When

Welding on In-Service Equipment containing Flammbles,

What Publication shall be followed?

Definition

 API 2201

Safe Hot Tapping Practices in the Protroleum and Petrochemical Industries

 

 

Answer found in

API 570: 8.2.1

Term
What is the minimum flash point temp of hydrocorbons used for leak testing
Definition

120°F

 

Answer found

API 570: 5.8.1

Term
At what temperature are special procedures needed for UT thickness readings
Definition

>150°F

 

Answer found

 API 570 5.7.1

Term
When welding, What minimum pre-heat temp is substituted for PWHT
Definition

300°F

 

 

API 570: 8.2.3.2

Term
What is the minimum pre-heat temperature, when a local PWHT is substituted for a full encirclement PWHT
Definition

300°F

 

570: 8.2.3.3.c

Term
When developing a Inspection plan, at what operating temperature should a Corrosion Specialist be consulted
Definition

>750°F

 

570:5.1.1.1

Term
What is the Minimum base metal temp during pressure testing when the wall thickness is ≤ 2" thick
Definition

(Minimum design metal temperature) MDMT + 10°F

 

 

570:5.8.3

Term
What is the Minimum base metal temp during pressure testing when the wall thickness is > 2" thick
Definition

(Minimum design metal temperature) MDMT + 30°F

 

 

570:5.8.3

Term
Whats the minimum duration of a hydro test to evluate integrity of buried pipe
Definition

8 hr's

 

570: 9.3.7

Term
Whats the Maximum time for obtaining thickness reading when corrosion rate on new pipe is not known (no other data available)
Definition

3 months

 

API  570: 7.1.2.c

Term
Whats the suggested interval for above-grade Visual surveillance of buried pipe
Definition

6 months

 

570: 9.3.1

Term
What is the length of time a API 570 AI must recertify
Definition

3 years

 

API 570 A.3.1

Term
What is the max thickness inspection interval for an injection point
Definition
Lesser 3yrs or 1/2 life
Term

What is the Max External Inspection interval for

Class 1 & 2 Piping

Definition

5 Years

 

API 570 6.7.3.2

Term
What is the Maximum Interval for Relief devices in fouling or corrosive service
Definition

5 years

 

API 570: 6.7.3.2

Term
What is the suggested interval for closed-interval Potential Survey of buried pipe with poor CP
Definition

5 Years

 

API 570: 9.3.2

Term
What the suggested interval fo evaluation of Soil Corrosivity for buried pipe with no CP
Definition

5 years

 

API 570 9.3.4

Term
What is the max thickness inspection interval for Class 1 Piping
Definition

Lesser of

5 years or 1/2 life

 

570 table 2

Term
What is the maximum interval for Relief devices in non- fouling or no-corrosive srvice
Definition

10 years

 

570: 6.7.3.2

Term
Whats is the Maximum External Inspection interval for Class 3 Piping
Definition

10 years

 

570: Table 2

Term
Whats the maximum Thickness Inspection interval for Class 3 piping
Definition

10 years

 

570: table 2

Term
What the maximum interval for RBI Re-assessment
Definition

Per table 2

 

570: 5.2.4

Term
When should temporary welded piping repairs be replaced
Definition

Next Opportunity

 

570: 8.1.4.1

Term
When shall non-welded repairs & temporary leak sealing devices be removed and pipe repaired
Definition

Next turnaround

 

570: 8.1.5

Term
What is the maximum size fillet weld patch on pipe repairs
Definition

Size of a the fillet weld patch should not exceed 1/2" the pipe diameter

 

Answer found

API 570: Fig C.2

Term
At an Injection point curcuit what is the minimum upsteam limit that is to be examined
Definition

12" or 3 pipe dia. whichever is greater

 

Answer found

API 570: 5.5.9

Term
At an Injection point curcuit what is the minimum downstream limit of a more extensive examination
Definition
10 pipe dia. downstream of the injection point
Term
What is the minimum downstream limit of an Injection point curcuit
Definition

Lesser of:

1st change in direction + 25'

or

2nd change in direction

 

API 570: 5.5.9