Shared Flashcard Set

Details

Salem 2013 SRO CERT
500 KV Objectives Study Guide
11
Other
Professional
07/20/2013

Additional Other Flashcards

 


 

Cards

Term

500KV Elecetrical System

Purpose

Definition

a. Receive 500 KV generated power via two banks of 3 ,single phase step up Transformers and transmit this power over 3 transmission lines.

b. Provide offsite power to each units auxiliaries and to each units protection system and safety systems during abnormal and accident conditions. via: 13KV-4KV step down Station Power Transformers.  

Term
3 transmission lines connected to te 500 KV Ring bus
Definition

1. Hopecreek

2. New Freedom

3. Orchard(Dean)

Term
How many bus sections are in the 500 KV system and how are they connected?
Definition

7 Bus sections:

Bus sections 1 and 2 connect the other sections in a ring bus formation and connect the 1,2,3,4 SPT to the 500KV system. The SPT step down the 500 to 13 KV.

Term
How many Breakers are in the 500 KV ring bus and what sections do they connect?
Definition

8

 

2-6, 2-8, 2-10

 

5-6, 9-10

 

1-5, 1-8, 1-9

Term
Which Breakers can be controled by the dispatcher remotely?
Definition

The Breakers that isolate the outgoing and incoming Transmission Lines:

2-10, 2-8, 2-6

5-6, 1-8, 9-10

Term

Breaker position during full operation?

 

Single Unit operation?

 

Single unit operation with drops disconnected?

Definition

All 500KV breakers closed

 

Output breakers open all others closed

 

All 500KV breakers closed

 

 

 

 

Term
Describe "Breaker and a half Scheme"
Definition
3 Breakers protecting 2 Lines or Sections
Term
Name the output breakers for unit 1 MPT and Unit 2 MPT
Definition

Unit 1: 5-6, 1-5

 

Unit 2: 9-10, 1-9

Term
500 KV Breaker description
Definition
SF6 Arc suppressing gas filled with 2 interupting heads
Term
Name 4 circuit switchers and their operation
Definition

1T60 2T60 3T60 4T60

 

Remotely and automatically isolates high side of the SPT upon a low side bus ground fault.

 

Circuit switchers have both cicuit interupters and automatic diconnect features.

Term
500 KV related Tech Specs
Definition

3.8.1.1 AC Sources- Operating:

LCO: a. 2 independent sources of OSP

b. 3 seperate EDG with seperate day tanks min of 130g of fuel and a common FOST min volume of 23000g and 2 FTPs

3.8.1.2 AC Sources -Shutdown:

LCO: 1 source of OSP and 2 EDG and 1 FTP

Supporting users have an ad free experience!