Term
reservoir engineering encompasses what branches |
|
Definition
environmental, geothermal, and petroleum |
|
|
Term
the reduction of well spacing, remain in the same section of the reservoir (not drilling a different part of the reservoir) |
|
Definition
infill drilling (reservoir exploitation) |
|
|
Term
5 requirements of a reservoir. (if you don't have 1 of these, you don't have a reservoir) |
|
Definition
1. source (typically organic rich shales) 2. Trap or Seal 3. Migration Pathway 4. Storage Capacity (must be porous) 5. Transmissivity (must be permeable, able to flow) |
|
|
Term
why does oil volume shrink as it is brought from the reservoir to surface? |
|
Definition
gas evolves as the pressure is lowered |
|
|
Term
why does gas volume expand? |
|
Definition
|
|
Term
why does gas volume contract |
|
Definition
|
|
Term
when would you want to use a dissolved (or solution) gas drive? |
|
Definition
when you have an oil that is "undersaturated" gas. Initially no free gas is present (volatile and black oils) |
|
|
Term
they are on the stock market. does not include private companies |
|
Definition
publicly traded companies (they HAVE to report to the SEC) |
|
|
Term
what do companies have to report to the SEC |
|
Definition
Proved net reserves economic forecast using existing costs and product prices |
|
|
Term
"much more likely to be achieved than not" |
|
Definition
"reasonable certainty" (proved reserves) |
|
|
Term
"reasonable certainty," economic under existing conditions, supported by actual tests and production |
|
Definition
|
|
Term
a significant investment is required. Reasonably certain that the locations will be developed. |
|
Definition
undeveloped proved reserves |
|
|
Term
There are fish in the lake. You may have caught some yesterday. You may have even be able to see them. But you have not caught any today. |
|
Definition
|
|
Term
There is water in the lake. Someone may have told you there are fish in the lake. You have the boat on the trailer. But you might go pay golf instead. |
|
Definition
|
|
Term
-Usually early in the reservoir life. -Good estimates require a lot of work. -Evaluated as "similar to" another reservoir. -Monte Carlo statistical simulation |
|
Definition
|
|
Term
-Requires reasonably accurate pressure, PVT, and production data. -pressure needs to be an appropriate "average" for entire reservoir |
|
Definition
|
|
Term
can be done throughout the life of the reservoir to find additional areas that may not be draining to the production wells. -requires considerably more computational effort |
|
Definition
|
|
Term
requires the least amount of information to tell you something about the reservoir |
|
Definition
"type curves" (Decline Curve Analysis) |
|
|
Term
Just says that the production rate will/won't continue @ the #s used to create the curve |
|
Definition
|
|
Term
uses the most ubiquitous data that you have available to you |
|
Definition
|
|