Term
1. Which component of the immersion heater combustion chamber seperates the cobustion chamber and makes sure air fully circulates as it travels through the heater? |
|
Definition
|
|
Term
2.Fuel dripping from the fuel valve, drops and falls onto which component of an immersion heater? |
|
Definition
|
|
Term
3. Which type of heater uses a siphon to start the fuel flowing from the fuel can to the control valve? |
|
Definition
|
|
Term
4. Which burner is used in a preway tent heater? |
|
Definition
|
|
Term
5. How many strokes are required to prime a preway heater? |
|
Definition
|
|
Term
6. When lighting a preway heater, you first press the reset lever of the fuel control valve down and turn the control knob to |
|
Definition
|
|
Term
7. The heat output on a preway heater is increased by turning the control knob |
|
Definition
|
|
Term
8. What would likely cause a heavy soot deposit in the burner on a preway heater? |
|
Definition
Restricted combustion air inlet |
|
|
Term
9. A fluctuating flame in a preway heater is caused by |
|
Definition
|
|
Term
10. during a preway tent heater operation, waht causes a high draft condition? |
|
Definition
additional lengths of smoke stacks added on |
|
|
Term
11. What size vessel is used for the 500,000 Btu field boiler? |
|
Definition
|
|
Term
12. the operating temperature of a field boiler is? |
|
Definition
|
|
Term
13. Which Safety control only funtions if the operating limit contrl fails on a field boiler? |
|
Definition
|
|
Term
14. The relief valve on a shower shelter boiler automatically relieves excessive pressure if the water pressure exceeds... |
|
Definition
|
|
Term
15. What reading should you recieve on the multimeter when starting up a field boiler? |
|
Definition
A Steady reading of at least two volts |
|
|
Term
16. Which componet is used to adjust for proper combustion? |
|
Definition
|
|
Term
17. Once a field boiler is operating and you notice a fuel pressure of 100lbs per square inch, what action should u take? |
|
Definition
remove end cap, turn pressure screw countercockwise until u get prroper reading |
|
|
Term
18. when checking the high limit control for operation during the checkpoint period which componet has a jumperr wire installed? |
|
Definition
|
|
Term
19. if a field boiler is not filled with water what trouble will occur? |
|
Definition
boil should fail to start. |
|
|
Term
20. a noisy fuel pump in a field boiler is caused by the... |
|
Definition
|
|
Term
21. during nozzle repair, you have to remove the nozzle screen. how is this task done? |
|
Definition
turn the screen counter clockwise by hand |
|
|
Term
22. what item is inspected for scaling and deterioation? |
|
Definition
electrode rod on low water probe |
|
|
Term
23. within what temperature range is the 150 cubic ft. refrigeration unit designed t operate. |
|
Definition
|
|